02.03.2018 Views

280218_Luxor-Egypt SECAP Final_revised

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Loans and potential borrower<br />

Expected annual cost savings to City budget<br />

9. Projected Energy Estimates in 2030<br />

Energy savings GWh/y<br />

- Improved management and awareness among transport operators would<br />

lead to a 10% reduction in energy consumption from 2020 onwards,<br />

200,240 GWh/year<br />

from 2020 onwards<br />

- Providing the Sustainable, Clean and Green Urban Mobility Master Plan<br />

implementation would have started in 2020 the latest and would<br />

demonstrate a 50% progress in implementation in 2030 the expected<br />

impact of such a plan should generate a 30% reduction in energy<br />

consumption by 2030, including:<br />

• New engine technologies will allow securing à 10% reduction,<br />

• Active mobility development (cycling and walking) allow 5% reduction,<br />

• Urban planning allows traffic optimization that will reduce consumption<br />

by 10%,<br />

• Public transport system and RTB service to airport result in another 5%<br />

reduction.<br />

Renewable energy production MWh/y<br />

600,720 GWh/y by 2030<br />

including:<br />

200,240 GWh/year<br />

100,120 GWh/year<br />

200,240 GWh/year<br />

100,120 GWh/year<br />

Not relevant<br />

CO 2 reduction t CO 2/y<br />

- Reference Year<br />

- Target Year<br />

- Net reduction by 2030<br />

- Reduction as related to BAU scenario (transport sector)<br />

2015<br />

2030<br />

212,325 ktCO 2 eq./year<br />

30%<br />

133

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!