02.03.2018 Views

280218_Luxor-Egypt SECAP Final_revised

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Contribute to better corporate governance and financial sustainability in the management of<br />

investment projects and the operation and maintenance of public infrastructure.<br />

• Adhere to policy dialogue on provision of infrastructure jointly with other donors.<br />

• Creation of new/ higher quality jobs in the area of environmental and REs 53 .<br />

In 2008, Climate Change Risk Management Programme (CCRMP) has been established as a result of a<br />

partnership between <strong>Egypt</strong> and the Millennium Development Goals Achievement Fund (MDGAF).<br />

The CCRMP has three main objectives to:<br />

• Integrate GHG mitigation into national policy and investment frameworks;<br />

• Increase CC adaptation capacities, particularly in agriculture and water;<br />

• Raise awareness regarding the impacts of climate change 54 .<br />

Key achievements that came out of such joint programme are to successfully assist in and support the<br />

establishment of the following units and capacity building:<br />

a. Clean Development Mechanism Awareness and Promotion Unit (CDMAPU),<br />

b. Energy Efficiency Unit (EEU) that advises the Cabinet on energy efficiency,<br />

c. The MoWRI’s capabilities to forecast climate change scenarios, and<br />

d. The irrigation research and climate change crop simulation activities of the Ministry of Acclamation of<br />

Land Resources (MALR) 51 .<br />

In 2010, <strong>Egypt</strong> published, in response to the SNC to UNFCCC a National Environmental, Economic and<br />

Development Study (NEEDS) for CC which outlines the financial and institutional needs for implementing<br />

prospective and on-going adaptation and mitigation measures. This study recognizes that the next phases of<br />

CC planning should include a National Action Plan for Adaptation (NAPA) and National Low Carbon Economy<br />

Plan (NLCEP). The NEEDS report highlights the urgency for developing a GHG monitoring system that<br />

aggregates and disseminates information about GHG emissions across sectors. In 2014, the Ministry of<br />

Environment (MoEnv) signed an agreement with the Italian counterpart to transform El-Gouna City into the<br />

first carbon-neutral city in Africa 51 . In addition, the UNEP developed the National Strategy Study entitled:<br />

‘Energy Efficiency and Renewable Energy National Study (EERENS), which was developed in 2007 as part of<br />

both the Mediterranean and National Strategies for Sustainable Development under Priority Field of Action<br />

2: Energy and Climate Change 55 .<br />

53<br />

Swiss Economic Cooperation and Development, <strong>Egypt</strong> Country Strategy 2013-2016 - available at:<br />

www.seco-cooperation.admin.ch/laender/.../index.html?lang<br />

54<br />

Climate Change Legislation in <strong>Egypt</strong>: The 2015 Global Climate Legislation Study - A Review of Climate Change Legislation in 99 Countries, 2015,<br />

http://www.lse.ac.uk/GranthamInstitute/wp-content/uploads/2015/05/EGYPT.pdf (Accessed: 25.08.2016)<br />

55<br />

http://www.eeaa.gov.eg/en-us/mediacenter/reports/guidelines.aspx/ (Accessed: 10.08.2016)<br />

Guidelines of Principles and Procedures for Environmental Impact Assessment, 2nd Edition, Ministry of Environment, EEAA, January 2009:<br />

http://www.eeaa.gov.eg/portals/0/eeaaReports/N-EIA/English_EIA_guidelines.pdf/ (Accessed: 09.08.2016)<br />

88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!