02.03.2018 Views

280218_Luxor-Egypt SECAP Final_revised

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

lower GHG emissions. This action is set through the following assessments and development:<br />

• Get a detailed understanding of the tourism sector (hotels and resorts) and its pattern in energy use;<br />

- Assess the current 38 hotels in terms of fuel and power use,<br />

- Examine the conditions and availability of energy efficiency measures in these hotels and resorts:<br />

lighting and AC, overall building performances, etc.,<br />

- Assess the detailed potential for renewable energy development in hotels and resorts,<br />

- Explore the amount of natural gas needed to supply hotels and resorts in combination with<br />

renewable energy,<br />

• Establish a plan for of stakeholders’ involvement to ensure conditions of success are met.<br />

Administrative and coordination process<br />

• Governorate of <strong>Luxor</strong> – City of <strong>Luxor</strong> (Municipality) and Governor’s to approve the plan and its targets,<br />

• City Council represented by the Governor approval,<br />

• Hotel owners and management in <strong>Luxor</strong> – approvals,<br />

• Ministry of Petroleum and Mineral Resources (MoPMRs) – study and approve the quantity of the natural<br />

gas needed for these Hotel connection, including:<br />

- (EGAS and Ganoub El Wady Holding Company) – study and approvals,<br />

- <strong>Egypt</strong> GAS Company – Governorate of <strong>Luxor</strong> (approval for NG supply),<br />

• Ministry of Electricity and Renewable Energy (MoERE) – NREA to approve the plan of SWH systems,<br />

• Ministry of Tourism (MoTrm) – Award GB license as part of the hotel license renewal,<br />

• Ministry of Environment (MoEnv) – Assess the Strategic environmental and social impacts and benefits,<br />

and<br />

• Ministry of Investment and International Cooperation (MoIIC) – international investment approvals.<br />

Government and Administrative Procedures and Approvals<br />

• Initial approval of the Governorate (Municipality),<br />

• Environmental permit: according to <strong>Egypt</strong>ian Law for the Environment, Law 4/1994 amended by Law<br />

9/2009,<br />

• EEAA approval and process: a Preliminary Strategic Environmental and Social Impacts (SESIs),<br />

• Safety and Operation permit by EGAs, Ganoub El-Wady Holding – MoPMRs, and<br />

• MoPMRs approve the supply natural gas by EGC.<br />

Atmosphere and Air Pollution<br />

- COP 21 Paris climate change agreement,<br />

- United Nations Framework Convention on Climate Change,<br />

- Vienna Convention for the Protection of the Ozone Layer,<br />

- Montreal Protocol on Substances that Deplete the Ozone Layer,<br />

- London Amendment to Montreal Protocol on Substances that Deplete the Ozone Layer, and<br />

165

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!