5. Proposed Interventions<br />

Based on the indications above, an integrated master plan is a must. Nevertheless, due to current hazards and<br />

risks caused by the above exhibited problems, it is recommended to start immediately with the following list<br />

of immediate actions.<br />

5.1 Project fiches for immediate/short term actions<br />

5.1.1 Tourist Centre and Ticketing Office<br />

1. General presentation<br />

Al-Qurna – Priority action # 1 for <strong>SECAP</strong><br />

Title: TOURIST CENTRE AND TICKETING OFFICE<br />

Summary of the Action<br />

Though the West Bank is rich with some of the most important monuments and cultural<br />

tourism attractions, it doesn't contain any tourist information centre or proper ticket<br />

centre, while it is missing proper historical site management in general.<br />

The proposed project is a tourist information centre equipped with necessary facilities<br />

and trained staff with the following tentative architectural programme:<br />

Tourist Information Centre – 200 m 2<br />

First floor<br />

Reception + Lobby – 50 m 2<br />

Waiting area – 60 m 2<br />

Café area – 25 m 2<br />

Small Shop – 25 m 2<br />

Ticketing office – 10 m 2<br />

Toilets – 15 m 2 x2<br />

Second floor<br />

Event centre – 30 m 2 (Optional)<br />

Storage – 20 m 2<br />

Offices + Facility management – 30 m 2<br />

Police office/station – 20 m 2<br />

Exhibition – 40 m 2 (Optional)<br />

Facilities room (cleaning and services) – 20 m 2<br />

Toilets –<br />

15 m 2 x2<br />

General Objectives of the project<br />

Focusing on improving heritage site management and the archaeological site visits.<br />

Specific Objectives of the project<br />

a) To provide an information centre for the necessary guidance and information to<br />

improve site and site visits,<br />

b) To support individual tourism,<br />

c) To provide an advanced ticketing service,<br />

# 1<br />

Location: Al-Qurna Village<br />

Start date: 2017<br />

Project lifetime: 12 months<br />

- 6 months: getting necessary<br />

consents, select location<br />

appoint project committee<br />

members, developing TOR up<br />

to selecting the best design<br />

alternative, and<br />

- 6 months: for work initiation<br />

and construction and<br />

inauguration and the<br />

accompanied Awareness<br />

Campaign and staff training.<br />

End date: 2018<br />

Estimated cost €<br />

65,000<br />

Status of the Action:<br />

• New<br />

• Planned<br />

• Under implementation<br />

• Following previous action.<br />

17