Army Emergency Management Program - Federation of American ...
Army Emergency Management Program - Federation of American ...
Army Emergency Management Program - Federation of American ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 15–1<br />
<strong>Emergency</strong> management full-scale exercise requirements—Continued<br />
<strong>Emergency</strong> <strong>Management</strong> Full-Scale Exercise Requirements<br />
Criteria Description Chapter<br />
Activation <strong>of</strong> the installation EOC to Activation<br />
Level 3 (partial) or higher<br />
Activation <strong>of</strong> 3 or more Category 5 first<br />
responders for all sudden onset hazards<br />
Establishment <strong>of</strong> incident command for all<br />
sudden onset hazards<br />
Activation <strong>of</strong> 1 or more continuity plans by<br />
a mission essential function (MEF)<br />
Activation <strong>of</strong> one or more business continuity<br />
plans by a tenant business<br />
Activation <strong>of</strong> 1 or more tenant EAPs by a<br />
tenant command<br />
Physical movement (evacuation) <strong>of</strong> no less<br />
than 10–20 simulated evacuees<br />
Initiation <strong>of</strong> personnel accountability procedures<br />
using ADPAAS<br />
1) Must include at least one shift rotation (either during exercise or as 2part<br />
exercise series).<br />
2) Establish geospatially referenced common operating picture (computerbased<br />
or manual).<br />
3) Maintenance <strong>of</strong> an event log.<br />
4) Exchange <strong>of</strong> 1 or more requests or status updates to a response partners<br />
<strong>of</strong>f the installation (computer-based or via fax).<br />
5) Activation <strong>of</strong> 1 or more support agreements with associated resource<br />
management process, to include identification <strong>of</strong> costs.<br />
6) Establishment <strong>of</strong> an emergency cost accounting code.<br />
7) Demobilize assigned units.<br />
8) Demobilize and return installation EOC to activation level normal.<br />
1) Activation by installation dispatch center.<br />
2) Movement to one or more incident scenes.<br />
3) Establishment <strong>of</strong> incident command.<br />
4) Conduct one or more responder accountability roll calls.<br />
5) Conduct one or more resource requests to the installation dispatch center.<br />
6) Conduct one or more resource requests to the installation EOC.<br />
7) Close out incident command and demobilize assigned units<br />
1) Must include at least 1 shift rotation (either during exercise or as 2-part<br />
exercise series).<br />
2) Written IAP.<br />
3) Staffing <strong>of</strong> at least 2 section chief positions and 2 branch director positions.<br />
(If assigned)<br />
1) Employment as stated in functional exercise requirements above.<br />
1) Notification by installation dispatch center via mass warning and notification<br />
system.<br />
2) Communication <strong>of</strong> warning message throughout tenant organization<br />
within 10 minutes <strong>of</strong> receipt (survey or spot check to ensure coverage).<br />
3) Activation <strong>of</strong> one or more SIP and/or evacuation wardens, if assigned.<br />
4) Review <strong>of</strong> SOPs and resource requirements.<br />
5) Demobilization.<br />
1) Notification by installation dispatch center via mass warning and notification<br />
system.<br />
2) Communication <strong>of</strong> warning message throughout tenant organization<br />
within 10 minutes <strong>of</strong> receipt (survey or spot check to ensure coverage).<br />
3) Activation <strong>of</strong> one or more SIP and/or evacuation wardens, if assigned.<br />
4) Review <strong>of</strong> SOPs and resource requirements.<br />
5) Demobilization.<br />
1) Must employ at least 50 percent <strong>of</strong> the identified evacuation management<br />
team.<br />
2) Must include 1 or more people from the following vulnerable populations:<br />
Category 2TR population.<br />
Category 2SN population.<br />
Category 2AN population.<br />
Category 2SC population.<br />
3) Must include 1 or more non-English-speaking person.<br />
4) May be volunteer participants vice actual residents or tenants.<br />
5) May be evacuated on foot or by vehicle.<br />
6) May include activation <strong>of</strong> 1 or more collection points, depending upon<br />
the scenario.<br />
7) Must be returned to original location when directed by installation EOC.<br />
8) Demobilize evacuation management team.<br />
1) Activation <strong>of</strong> the personnel accountability staff.<br />
2) Minimum <strong>of</strong> one report to the installation EOC.<br />
3) Demobilize personnel accountability staff.<br />
146 DA PAM 525–27 20 September 2012<br />
11<br />
11<br />
11<br />
10<br />
10<br />
6<br />
12<br />
12