Activation will detail when, where, and for how long the team is to be activated (which may be modified by the<br />
installation EOC’s discretion). The evacuation management branch liaison team will report to the installation EOC.<br />
Upon assembly at their designated staging area, the field components <strong>of</strong> the evacuation management team shall activate<br />
pre-coordinated evacuation routes through the coordinated deployment <strong>of</strong> <strong>Army</strong> law enforcement for traffic control,<br />
fielding <strong>of</strong> variable message boards, signage, cones, and directional markers along evacuation routes and initiation <strong>of</strong><br />
reverse-laning/contra-flow operations, if required to increase capacity. Field components <strong>of</strong> the evacuation management<br />
team will staff each predesignated collection point as shown in table 12–1. In order to monitor and report status <strong>of</strong><br />
evacuation operations to the installation EOC, the evacuation management will (1) provide the evacuation management<br />
branch function within the operations section <strong>of</strong> the installation EOC during the response phase (or as directed), (2)<br />
coordinate information with the personnel accountability activities and the FAC (or EOC liaison). The evacuation<br />
management team will coordinate reception <strong>of</strong> evacuees with receiving safe haven management teams and/or civilian<br />
shelters and report status <strong>of</strong> evacuation operations until all Category 2–4 personnel and those Category 1 or 5 personnel<br />
unassigned for the specific emergency have been evacuated and accounted for at their receiving locations. The<br />
evacuation management team shall then develop an evacuee return plan for phased or mass return <strong>of</strong> evacuees from all<br />
receiving locations and provide the evacuee return plan to the installation EOC planning section via the evacuation<br />
management branch staff. When directed during the recovery phase, the evacuation management team shall execute the<br />
evacuee return plan, staff predesignated collection points for return transfer <strong>of</strong> assisted evacuees, monitor implementation<br />
and progress, and report to the installation EOC, as directed. The evacuation management team may be demobilized<br />
by the installation EOC, when required.<br />
e. <strong>Management</strong>. Evacuation management teams consist <strong>of</strong> law enforcement, transportation, public works, and<br />
logistics personnel along with <strong>Army</strong> community service liaisons. Evacuation management teams, especially in Type III<br />
installations, may include additional duty personnel and volunteers, as needed. The team organization and composition<br />
shall be identified in the installation EM plan, shall be categorized as Category 5 emergency responders, and shall be<br />
issued appropriate identification and safety equipment (for example, radios, vests, rain gear, lights, whistle) regarding<br />
their assignment. It is the responsibility <strong>of</strong> the installation EMWG to ensure that issues regarding access control,<br />
transportation, and pay/compensation are addressed pre-incident during the preparedness phase. The evacuation management<br />
teams are typed resources as indicated in table 12–1.<br />
f. Equipment. Evacuation management teams require adequate transportation, workspace, communications capabilities<br />
and capacity, and supplies in order to perform its assigned tasks as detailed in table 12–1.<br />
g. <strong>Army</strong> resource typing definitions. As detailed in chapter 9, <strong>Army</strong> installations develop, field, and maintain NIMS<br />
Tier Two assets (defined as local, non-EMAC resources) for their EM program. The below resource typing definitions<br />
are local definitions only and should be frequently socialized with local civil jurisdictions (and host nations). <strong>Army</strong><br />
installations may align to local standards given the same service output and performance objectives. See table 12–1 for<br />
detailed information.<br />
Table 12–1<br />
Evacuation management team resource type definitions<br />
Resource Evacuation management team<br />
Category Evacuation management Kind Team<br />
Minimum capabilities Type I Type II Type III<br />
Component Metric<br />
Personnel 1 Total 342 total 162 total 69 total<br />
Manpower 1 Per shift (day/<br />
night)<br />
162d/180n 75d/87n 33d/36n<br />
EOC and/or liaisons Total per shift 6 total 5 total 1 total<br />
EOC evacuation branch director Total per shift 1 1 1<br />
EOC evacuation branch staff Total per shift 2 1 0<br />
City and/or local EOC liaison Total per shift 1 1 0<br />
DOL transportation liaison Total per shift 1 1 0<br />
City and/or local DOT liaison Total per shift 1 1 0<br />
Field personnel Total per shift 6 + Security 4 + Security 2 + Security<br />
ECP coordinator Assumes ECPs<br />
= Evac zones<br />
Security 2 Per traffic control<br />
point<br />
6 4 2<br />
As assigned As assigned As assigned<br />
DA PAM 525–27 20 September 2012<br />