Table 12–1<br />

Evacuation management team resource type definitions—Continued<br />

Resource Evacuation management team<br />

Category Evacuation management Kind Team<br />

Minimum capabilities Type I Type II Type III<br />

Component Metric<br />

Collection point teams Total # <strong>of</strong><br />

teams<br />

Total Per shift (day/<br />

night)<br />

6 4 2<br />

150d/168n 66d/78n 30d/34n<br />

Daytime operations Per shift 150 total 66 total 30 total<br />

Team leader Per collection<br />

pt.<br />

1 1 1<br />

Bus coordinators Per collection<br />

pt.<br />

12 6 3<br />

Special needs coordinator3 See note (2) (2) (2)<br />

School and/or childcare coord. 3 See note (2) (2) (2)<br />

Animal needs coordinator 3 See note (2) (2) (2)<br />

Community liaison Per collection<br />

pt.<br />

First aid and/or CPR provider Per collection<br />

pt.<br />

Security Per collection<br />

pt.<br />

Labor pool (to assist evacuees) Per collection<br />

pt.<br />

Total per shift Per collection<br />

pt.<br />

Night operations Add. total per<br />

night<br />

Lighting coordinator Per collection<br />

pt.<br />

Additional security Per collection<br />

pt.<br />

Additional total Per collection<br />

pt.<br />

Footprint<br />

1 1 1<br />

2 1 1<br />

4 2 2<br />

4 4 4<br />

24 + SN/SC/AN 15 + SN/SC/AN 12 + SN/SC/AN<br />

18 total 12 total 4 total<br />

1 1 1<br />

2 2 1<br />

3 3 2<br />

Evacuation zones For installation 6 4 2<br />

Clearance Time (planning estimate) For installation 72 hours 48 hours 36 hours<br />

Collection points 4 For installation 6 4 2<br />

Footprint Per 1000 sq. ft. 125k 75k 45k<br />

Dimensions Length x depth 500 ft x 250 ft 300 ft x 250 ft 300 ft x 150 ft<br />

Collection point lanes Per collection<br />

pt.<br />

Assigned equipment<br />

EOC branch director<br />

4 bidirectional 2 unidirectional 1 unidirectional<br />

Radios (with chargers) Same channel 1 1 1<br />

Liaison <strong>of</strong>ficers<br />

Radios (with chargers) Same channel 3 3 0<br />

Prepackaged equipment<br />

Container or trailer Prepackaged 1 1 1<br />

Radios (with chargers) 5 Same channel 6 + 1 per ECP/traffic control<br />

point (TCP)<br />

82 DA PAM 525–27 20 September 2012<br />

4 + 1 per ECP/TCP 2 + 1 per ECP/TCP