Download Adept Cobra PLC600 User's Guide - pulsar.com.tr
Download Adept Cobra PLC600 User's Guide - pulsar.com.tr
Download Adept Cobra PLC600 User's Guide - pulsar.com.tr
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Index<br />
E<br />
elec<strong>tr</strong>ical lines<br />
user 104<br />
in robot 104<br />
emergency<br />
situation, what to do 31<br />
stop circuits 63<br />
emissions<br />
sound 28<br />
encoder battery<br />
location of 124<br />
replacing 123<br />
encoder cables, warning label on 23<br />
end-effector<br />
dowel pin 101<br />
grounding 101<br />
installing 101<br />
environmental<br />
and facility requirements 35<br />
specifications 38<br />
EOAPWR connector<br />
location 105<br />
mating connector 107<br />
output specifications 108<br />
pinout 107<br />
equipment<br />
connecting customer-supplied 66<br />
connecting customer-supplied safety and<br />
power con<strong>tr</strong>ol 59<br />
for operators, safety 30<br />
grounding, robot-mounted 59<br />
or operators, safety 30<br />
safety requirements for additional 28<br />
to the system, connecting 60<br />
unpacking and inspecting the <s<strong>tr</strong>ong>Adept</s<strong>tr</strong>ong> 33<br />
error messages<br />
(alphabetical listing), PLC Server 151<br />
(numerical listing), PLC Server 149<br />
PLC Server 149<br />
error register 95<br />
error register definitions 95<br />
E-Stop<br />
circui<strong>tr</strong>y<br />
muted safety gate 64<br />
functions, verifying 75<br />
indication - remote sensing of E-Stop,<br />
user 64<br />
input, line 64<br />
switches, remote sensing of user 64<br />
user E-Stop indication - remote<br />
sensing 64<br />
ESTOP connector<br />
location 105<br />
Ethernet connector 47<br />
external equipment, mounting 108<br />
external tooling<br />
on top of robot arm 130<br />
on underside of outer link 131<br />
F<br />
facility overvoltage protection 52<br />
facility requirements, environmental 35<br />
fault codes, on diagnostic panel 72<br />
flange<br />
dimensions, tool 129<br />
installing 102<br />
removing 101<br />
frames, the coordinate system and<br />
reference 142<br />
front panel<br />
dimensions 134<br />
rear view 135<br />
schematic, optional 63<br />
functions, verifying E-Stop 75<br />
G<br />
getting additional help 19<br />
grease for the robot, required 117<br />
gripper orientation 147<br />
ground<br />
chassis 59<br />
point on AIB 58<br />
point on robot base 58<br />
screw on AIB chassis 121<br />
grounding<br />
PLC Server 58<br />
robot 58<br />
robot-mounted equipment 59<br />
system 57<br />
H<br />
harmonic drive, check robot for oil<br />
around 116<br />
hazard, thermal 29<br />
help, getting additional 19<br />
High Power<br />
indicator 124<br />
changing the lamp 124<br />
I<br />
I/O<br />
connector pin assignments, XDIO<br />
digital 70<br />
equipment, connecting customer-supplied<br />
digital 66<br />
impact and <strong>tr</strong>apping points 24<br />
160 <s<strong>tr</strong>ong>Adept</s<strong>tr</strong>ong> <s<strong>tr</strong>ong>Cobra</s<strong>tr</strong>ong> <s<strong>tr</strong>ong>PLC600</s<strong>tr</strong>ong>/PLC800 Robot User’s <s<strong>tr</strong>ong>Guide</s<strong>tr</strong>ong>, Rev B