PLC Server Installation<br />
Mounting the PLC Server<br />
The following mounting options are available for the PLC Server:<br />
•Rack<br />
•Panel<br />
•Table<br />
In addition, the PLC Server can be stack mounted (one unit placed on top of another). See<br />
the sections below for information on mounting the PLC Server; page 93 for information<br />
on mounting the sDIO.<br />
NOTE: To maintain <s<strong>tr</strong>ong>com</s<strong>tr</strong>ong>pliance with EN 60204 in European installations,<br />
the mounting of the PLC Server and all terminations at the PLC Server<br />
must be performed in accordance with this standard.<br />
Rack Mounting the PLC Server<br />
To rack mount the PLC Server in a standard 19-inch equipment rack, install the optional<br />
mounting brackets on the side of the PLC Server, as shown in Figure 3-3. These brackets<br />
must be ordered separately, they do not <s<strong>tr</strong>ong>com</s<strong>tr</strong>ong>e with the PLC Server.<br />
190.0<br />
R 3.6<br />
2X 40356-00004<br />
3X M3 x 6MM<br />
BOTH SIDES<br />
88.1<br />
44.4<br />
2X 25.0<br />
21.8<br />
19.1<br />
3.6<br />
TYP.<br />
462.0<br />
482.8<br />
3.8<br />
14.2<br />
Figure 3-3. Rack Mounting the PLC Server<br />
<s<strong>tr</strong>ong>Adept</s<strong>tr</strong>ong> <s<strong>tr</strong>ong>Cobra</s<strong>tr</strong>ong> <s<strong>tr</strong>ong>PLC600</s<strong>tr</strong>ong>/PLC800 Robot User’s <s<strong>tr</strong>ong>Guide</s<strong>tr</strong>ong>, Rev B 39