04.06.2014 Views

Download Adept Cobra PLC600 User's Guide - pulsar.com.tr

Download Adept Cobra PLC600 User's Guide - pulsar.com.tr

Download Adept Cobra PLC600 User's Guide - pulsar.com.tr

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Wiring the System<br />

NOTE: The power requirements for the user-supplied power supply will<br />

vary depending on the configuration of the PLC Server and connected<br />

devices.<br />

24 VDC Power Cabling<br />

In order to maintain <s<strong>tr</strong>ong>com</s<strong>tr</strong>ong>pliance with EN standards, DC power must be delivered over a<br />

shielded cable, with the shield connected to the return conductors at both ends of the<br />

cable as shown in Figure 4-8. Conductors should be 1.5 mm 2 - 1.85 mm 2 (16 to 14 AWG) in<br />

size. The maximum length for the 24 VDC cable is 10 meters.<br />

<s<strong>tr</strong>ong>Adept</s<strong>tr</strong>ong> PLC Server<br />

- +<br />

Note: Use connector<br />

supplied by <s<strong>tr</strong>ong>Adept</s<strong>tr</strong>ong> at<br />

this end of cable.<br />

Shield<br />

User-Supplied Shielded<br />

Power Cable<br />

Figure 4-8. User Supplied Power Cable<br />

+<br />

-<br />

User-Supplied<br />

Power Supply<br />

24VDC, 5A<br />

Daisy-Chaining Power<br />

The PLC Server is equipped with two DC power connectors. These connectors allow the<br />

daisy-chaining of power from one PLC server to another. When daisy-chaining power, the<br />

power supply circuit must be limited to the lesser of 8 Amps or the amperage rating of the<br />

cabling. This can be done with a circuit breaker or a fuse. The DC power can be applied to<br />

either the XDC1 or XDC2 connector.<br />

CAUTION: Use only one 24 VDC power supply per circuit.<br />

Failure to do this could result in damage to the equipment.<br />

Installing 24 VDC Connectors<br />

Use the <s<strong>tr</strong>ong>Adept</s<strong>tr</strong>ong>-supplied connectors to connect the customer-supplied 24 VDC power<br />

supply to the PLC Server. The connectors are Weidmuller #169042.<br />

1. Locate two 24 VDC connectors that are shipped with the PLC Server. See<br />

Figure 4-9 on page 57.<br />

2. Use 14 or 16 gauge wires to connect the 24 VDC power supply to the PLC Server.<br />

3. S<strong>tr</strong>ip 7 mm of insulation from the end of the wire that connects to the positive<br />

output of the 24 VDC supply.<br />

56 <s<strong>tr</strong>ong>Adept</s<strong>tr</strong>ong> <s<strong>tr</strong>ong>Cobra</s<strong>tr</strong>ong> <s<strong>tr</strong>ong>PLC600</s<strong>tr</strong>ong>/PLC800 Robot User’s <s<strong>tr</strong>ong>Guide</s<strong>tr</strong>ong>, Rev B

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!