08.11.2012 Views

Infortrend RAID Controller Manual

Infortrend RAID Controller Manual

Infortrend RAID Controller Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

12-22<br />

NOTE:<br />

Front Panel View of <strong>Controller</strong> Failure<br />

What will happen when one of the controllers fails?<br />

Should one of the controllers fail, the existing controller will<br />

automatically take over within a few seconds.<br />

The red ATTEN LED will light up, and the<br />

message "Redundant Ctlr Failure<br />

Detected" will appear on the LCD. Users<br />

will be notified by audible alarm.<br />

• Although the existing controller will keep the system working. You should contact<br />

your system vendor for a replacement controller as soon as possible. Your vendor<br />

should be able to provide the appropriate replacement unit.<br />

• Some operating systems (SCO, UnixWare, and OpenServer, for example) will not<br />

retry accessing the hard disk drives while controller is taking over.<br />

When and how is the failed controller replaced?<br />

Remove the failed controller after the "working" controller has taken<br />

over. For a controller with hot-plug capability, all you have to do is to<br />

remove front panel and pull out the eject levers to remove the failed<br />

controller.<br />

The new controller has to be pre-configured as the "Secondary<br />

<strong>Controller</strong>." (The replacement controller provided by your supplier<br />

should have been configured as the Secondary controller. It is<br />

recommended to safety check the status of the replacement controller<br />

before installing it to your redundant system. Simply attach power to<br />

the replacement and configure it as "Secondary." When safety check<br />

is done, remove the failed controller and install the replacement<br />

controller into its place.)<br />

When the replacement is connected, the "Auto-Failback" will start<br />

automatically (IFT-3102U2G and above). If the replacement controller<br />

does not initialize, execute the following steps for the new controller<br />

to function. Press [ENT] for 2 seconds on the existing controller to<br />

enter the main menu.<br />

Use ▼ or ▲ to choose "View and Edit<br />

Peripheral Dev..," then press [ENT].<br />

Choose "Set Peripheral Device Entry..,"<br />

then press [ENT].<br />

Redundant Ctlr<br />

Failure Detected<br />

View and Edit<br />

Peripheral Dev<br />

Set Peripheral<br />

Devices Entry ..<br />

<strong>Infortrend</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!