23.11.2012 Views

Technical b r Report - International Military Testing Association

Technical b r Report - International Military Testing Association

Technical b r Report - International Military Testing Association

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This lra~s ;IS to our third set 01’ conditions L tla; ten.!:; to affect the<br />

production of usable research and the proper USC’ of ir, tikc interface<br />

between research personnel and training personnel. This may well bc<br />

the area in which the greatest source of our t.rouble lies. Too often<br />

research personnel do not accompany the research report when it is<br />

submitted to training people, do not make a prcse:ltatitin to training<br />

people concerning it , and do not a.ssi,t in its ir,?lcme2tdtir~n.<br />

Clearly, it takes much more initiative on the p.irL of L!le trainfng<br />

people ta deciJe to make changes in their training operation on the<br />

basis of a report than it does 1.0 reach a c!ccisic:l to t3ke :~c~ion<br />

when the ii;iLiior of tile repot-t Jcscribes thr sLudy, cl:::-i!‘ics potnts<br />

that are n,?t understood, and makes logical rc~oxxnciatitins in ;I Cacc<br />

to face situation to the people who are rcsponsibit? for efficient<br />

training i:: the course conceri:ctl. Tht prob,i!~i 1 i :;; of successful<br />

inplementat i,>n is iurtlier enh:~:~cct~i ii the rcst~,tr25er culitinuc‘s t o<br />

work wil.1 cognizant training personnel througll~.. the implementation<br />

of the research results. Normally this does not require d great de.31<br />

of time and in my view, at least, is time better spent than in utilizing<br />

this same time on another research study, with t?le prnbabil ity<br />

that the results of neither of the two studies will be implemented.<br />

We have long known that in implementing any concept, responsibility<br />

for its oc~xrring must be fixed. I ;im tliereii~rk~ suggasting that each<br />

organization engaged in applied K&D sl~ould have ;I sma!i group, rcporting<br />

directly to the Techr.ical Director ol: tO ;ltt! Colrma~din~ Cf I iccr,<br />

whose primaq responsibility is two-fr,ld, first, to Ic7nk externally<br />

to fmplementation 0i RSD products and, second, to look i.ntern.llly to<br />

the design and product ion of products that at-c capable uf being implemented.<br />

Thus , on ~ha one hand this grolup wtr\:ld er.sxrc that RSD<br />

products were properly presented to nppropri.ate Lraining personnel,<br />

normally by the research personnel who did the work, and that assistance<br />

in inplementing the products was continuck! aIs lcng as npproprfate.<br />

On the other hand, prior to approval of an nppl ii-d research project the<br />

group woul\! ;\ssess the prr>bablc s~ileabil ily oc t i.c product Lllat the R&D<br />

project was likely to produce and so advise tl~z- Technic-al Director or<br />

Commanding Officer. If the purpose oi tl~r projcci was to produce a<br />

usable product and the proposed project W;IS juJl;eJ not to bc rapable<br />

ot producing such a product, it would be refcrrt\L? ilack to the orlginator<br />

for revision.<br />

At this point I will give the other members UC tli? pace1 a c!inncc to<br />

express their thoughts, repressetl or othcrwis~:. f hope tlzt they iirc<br />

going to tell us that I a$ the :)nly cne wlicl has c5served t!lc problems<br />

Z have rrilated. that cver;rthing runs smoothly in the training world<br />

with which they are familiar. But we will hnvc to wait and see if<br />

that is in fact the case. The plan for the syr,!:.-siua is to have two<br />

prepared papers, one by a trainer (Ilr. Wal tcr ?kIL~wei 1) .ind one by a<br />

researcher (Dr. %rman Kerr) . Thr papers will r?:en !:e discusscc’ by<br />

Lieutenant Colonel Donald Yead and Dr . . Will inn >:>onan.<br />

94

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!