23.11.2012 Views

Technical b r Report - International Military Testing Association

Technical b r Report - International Military Testing Association

Technical b r Report - International Military Testing Association

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

.<br />

The System Achievement Test, because of its objective to test the<br />

technicians' total system capabilities, is a relatil-ely lengthy test.<br />

The SAT ranges from one J-hour Session to fez such sessions, dept>ding<br />

on the particular PPP/TPS requirements. Obviously uitb a test this<br />

long, we were concerned witi: the attitude CF -2.e personnel required to<br />

take it. Surprisingly, after the initial gr-amblings, cbe technicians<br />

appear to vie2 the SAT as an integral part of their training progran.<br />

Some technicians :..-vc even provided rccornendaticns to improve various<br />

aspects of the tests.<br />

The DDS exercises require the use of the sa=e technical docoinentation<br />

employed by the techn,cians when troubleshoczing similar casualties<br />

onboard ship. h'e decided early in the develcpment of the program that<br />

close monitoring of the change status of'thc publicaticcs would be<br />

required to insure currency of the tests. Tt was also decided that<br />

the local Navy team at each site should maintain its own technical<br />

library to insure positive control of the change status of the publi-<br />

cations used with the tests. This decision created ex-.rc: work for the<br />

teams but reduced the cries of "this won't Lark" during t!le test sessions.<br />

During the first year of testing, the raw results \;ere mailed from the<br />

test site to the central site for scoring. This created a delay of 10<br />

to 15 days from the completion of the test to the time the results<br />

were returned. The pro+jran managers in the S*Jategic Systems Project<br />

Cffi;a ji:act& that tiiis turnarOund time be reduced CO enabie commands<br />

to schedule remedial training, if the test results indic-ited a signifi-<br />

cant deficiency, prior to departure for patrol. An optical scanning<br />

device and a teletype machine were used to solve this problem. The<br />

Navy team processes the examiners' answer sheets thrcugh the optical<br />

2<br />

.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!