in the instrument, but most of the redundant questions were asked only<br />

once to minimize the length of the survey.<br />

Of the 295 surveys sent to supervisors at 88 Air Force bases, 20’7<br />

were returned. All responses were manually e.&ted and keypunched<br />

for transferal of the survey data to magnetic tape.<br />

The questionnaire’s length might have been responsible for a reduced<br />

response rate toward the end of.the instrument, but response rates for<br />

all three survey approaches were sufficient to enable co,nparison of the<br />

alternative txchniques.<br />

A detailed report of the survey data and an in-depth discussion of<br />

their implications will be forthcoming soon in an AF Human Resources<br />

Laboratory technical report. For brevity and to minimize duplication<br />

Table 2 describes item content and mean responses without discussion<br />

of their implications. The reader is cautioned against ixferring strong<br />

conclusions from this limited display of data.<br />

.4 cost estimate for each OJT cost factor is exhibited in Table 3. The<br />

cost models used to compute these estimates were selected from several<br />

cost models based on various combinations of the three survey approaches.<br />

Again, a more rigorous discussion will soon appear in AFHRL publication.<br />

The OTT cost per trainee of S1545 can be %ompa.red to the marginal cost<br />

per trainee o course 3Af3R 70230, S2271. There are criteria other<br />

than costs which are equally inrportant, viz. , training capacities ar.d<br />

quality of the training. Thus, conclusions regarding optimal OJT/‘TTS<br />

mists for the Administrative Specialty based only on data in this report<br />

would be reached without considering other important criteria. These<br />

criteria are discussed l~~ a <strong>Technical</strong> <strong>Report</strong> in review at AFHRL. ’<br />

Z The cost of Tech schoorwas obtained from FUSD Corporation data.<br />

- !<br />

. -._.<br />

62<br />

. _<br />

, _- .- _..<br />

.<br />

._. .~. _. .*. - -. A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!