19.06.2013 Views

FY2014 Recommended Budget - City of Surprise

FY2014 Recommended Budget - City of Surprise

FY2014 Recommended Budget - City of Surprise

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Major Initiatives and Policy Issues<br />

Develop a long term stripping replacement program in concert with the ongoing Pavement<br />

Preservation Program<br />

Conduct a pilot study on Wireless Solar Radar Speed Displays and analyze data on the<br />

effectiveness <strong>of</strong> slowing traffic through school zones<br />

Enhance the “Traffic Signal Pre-emption” technology to more effectively clear intersections<br />

automatically for approaching emergency vehicles<br />

Conduct a pilot study on the use <strong>of</strong> radar detection at signalized intersections as a method <strong>of</strong><br />

more accurately identifying traffic flows and enhancing traffic flow during peak periods<br />

Major <strong>Budget</strong> Changes<br />

The <strong>FY2014</strong> budget increased by 33% from the FY2013 amended budget. The decreases in personnel<br />

expenditures are due to the movement <strong>of</strong> positions formerly funded directly by HURF being moved back<br />

to the general fund for <strong>FY2014</strong>. Instead <strong>of</strong> direct funding, the cost <strong>of</strong> these positions will be allocated<br />

through the city’s indirect cost allocation plan. These decreases were <strong>of</strong>fset by a 3% increase in the<br />

employer contribution for the Arizona State Retirement System and a 2.2% increase for a cost <strong>of</strong> living<br />

adjustment.<br />

Supplies expenditures increased by 6% for vehicle maintenance and street repair material.<br />

Services expenditures increased by 10% for landscape services for overseeding on Bell Road, water rate<br />

changes and usage for Loop 303 landscaping, electricity rate changes, and landfill fees. The increases<br />

were <strong>of</strong>fset by decreases in vehicle maintenance and by changing cell service carrier.<br />

FY2011 FY2012 FY2013 <strong>FY2014</strong> Amended to<br />

Expenditures<br />

By category<br />

Actual Actual Amended <strong>Budget</strong> <strong>Budget</strong><br />

Personnel 2,997,476 3,158,277 2,939,200 2,870,900 -2%<br />

Supplies 831,379 862,533 858,800 912,600 6%<br />

Services 1,717,078 1,755,792 1,992,900 2,182,500 10%<br />

Capital 49,409 0 0 0 0%<br />

Contingency 0 0 0 1,764,600 0%<br />

Transfer Out 2,071,800 0 0 0 0%<br />

Total<br />

By department<br />

7,667,142 5,776,602 5,790,900 7,730,600 33%<br />

Public Works 7,667,142 5,776,602 5,790,900 7,730,600 33%<br />

Total 7,667,142 5,776,602 5,790,900 7,730,600 33%<br />

Revenues<br />

By fund source<br />

State Shared 5,275,645 5,906,800 6,613,600 6,617,500 0%<br />

Charges for Svcs/Oth 119,679 25,377 11,400 11,600 2%<br />

Transfer In 0 0 0 0 0%<br />

Fund Balance 0 -155,575 -834,100 0 -100%<br />

Total 5,395,324 5,776,602 5,790,900 6,629,100 14%<br />

173

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!