D. Install piping to allow for expansion <strong>and</strong> contraction without stressing the pipe, joints, or<br />

connected equipment.<br />

E. Slope piping <strong>and</strong> arrange systems to drain at low points.<br />

F. Die cut screw joints with full cut st<strong>and</strong>ard taper pipe threads with approved non-toxic joint<br />

compound applied to male threads only.<br />

G. In steel piping, main sized saddle branch connections or direct connection of branch lines to<br />

the mains will be permitted if the main is one pipe size larger than the branch line for up to 6"<br />

diameter mains <strong>and</strong> if the main is two pipe sizes larger than the branch for 8" <strong>and</strong> larger<br />

mains. Do not project branch pipes inside the main.<br />

H. Do not penetrate building structural members unless indicated to do so or without the specific<br />

approval of the Engineer. When cutting is approved, the actual size of holes shall be no<br />

larger than the diameter of the pipe plus 1/2" clearance.<br />

I. Provide sleeves when penetrating floors <strong>and</strong> walls.<br />

J. Seal pipe <strong>and</strong> sleeve penetration to achieve fire resistance equivalent to rating of the wall or<br />

floor penetrated.<br />

K. Prepare pipe, fittings, supports, <strong>and</strong> accessories for finish painting. Where pipe support<br />

members are welded to structural building framing, scrape, brush clean, <strong>and</strong> apply one (1)<br />

coat of zinc rich primer to welding. Provide finish painting in accordance with Division 9,<br />

PAINTING. Color shall be Red.<br />

L. On main water supply piping below grade, install steel rod pipe clamps at the 90 degree bend<br />

from horizontal to vertical riser. Provide approved thrust restraint systems.<br />

M. Support horizontal piping from the structure using ferrous pipe hangers for ferrous pipe <strong>and</strong><br />

copper hangers for copper pipe <strong>and</strong> all-thread steel rods (or brass for copper). Provide pipe<br />

hangers capable of supporting five (5) times the weight of the water-filled piping plus 250<br />

pounds. The maximum spacing of hangers shall be not greater than 10' for pipe sizes up to<br />

1-1/4" <strong>and</strong> 12' for larger pipe sizes. Supports for non-metallic pipe shall be in accordance<br />

with the manufacturer's requirements.<br />

N. Support risers at the ground level <strong>and</strong> not less than each second floor in multi-floor<br />

installations.<br />

O. Inspector's test piping shall not be less than 1" diameter <strong>and</strong> each location shall be equipped<br />

with a globe valve.<br />

3.03 VALVE INSTALLATION<br />

A. Install valves with stems upright or horizontal, not inverted.<br />

B. Provide gate valves or butterfly valves for shut-off or isolating service.<br />

C. Provide drain valves at main shut-off valves <strong>and</strong> at low points of piping <strong>and</strong> apparatus.<br />

3.04 FIELD QUALITY CONTROL<br />

A. Perform testing required by NFPA 13 <strong>and</strong> regulatory authorities. <strong>Inc</strong>lude the cost of such<br />

testing in the proposal.<br />

Facility Fire Suppression Water Service Piping 21 11 00 - 5<br />