28.04.2015 Views

final bid specs 09328.pdf - Freese and Nichols, Inc.

final bid specs 09328.pdf - Freese and Nichols, Inc.

final bid specs 09328.pdf - Freese and Nichols, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. Areas of the fill being compacted with power h<strong>and</strong> tampers or vibratory plate h<strong>and</strong><br />

compactors shall receive a minimum of eight (8) passes of the equipment with an overlap<br />

of 50% of the equipment base plate width.<br />

4. The in-place density of Class 1 through Class 5 Earth Fill shall not be less than 95% of<br />

maximum dry density as determined by ASTM D-698, St<strong>and</strong>ard Proctor, except compact<br />

the top 12" of fill underneath roadways <strong>and</strong> parking areas to not less than 100% of<br />

maximum dry density as determined by ASTM D-698, St<strong>and</strong>ard Proctor. In areas cut<br />

underneath roadways <strong>and</strong> parking areas scarify <strong>and</strong> re-compact the top 8" of the<br />

subgrade within the specified moisture content, to not less than 100% of maximum dry<br />

density as determined by ASTM D-698, St<strong>and</strong>ard Proctor.<br />

5. Compact cohesionless materials on which are not practical to control the density by<br />

proctor methods to a minimum of 75% relative density as determined by ASTM D-4253<br />

<strong>and</strong> ASTM D-4254. At the discretion of the Engineer, an alternate method of determining<br />

relative density may be used which has been correlated with methods ASTM D-4253 <strong>and</strong><br />

ASTM D-4254.<br />

6. If necessary, to achieve the specified density, increase the number of passes of the<br />

compaction equipment, <strong>and</strong>/or modify the weight of the compaction equipment.<br />

7. Regardless of the density achieved, the number of passes of the compaction equipment<br />

shall not be less than eight (8).<br />

3.05 FIELD QUALITY CONTROL<br />

The Owner is responsible for the costs involved in providing an approved testing laboratory to<br />

perform quality control testing of backfill operations. The testing laboratory shall make tests of inplace<br />

density in accordance with ASTM St<strong>and</strong>ards. The testing laboratory shall monitor backfill<br />

operation continuously or at intervals acceptable to the Owner <strong>and</strong> Engineer at structures. It shall<br />

be the responsibility of the Contractor to notify the testing laboratory before backfill operations<br />

begin.<br />

1. Unless noted otherwise, in-place density tests shall be conducted at a rate of one test per<br />

3,000 square feet for every lift.<br />

END OF SECTION<br />

Structural Excavation <strong>and</strong> Backfill 31 23 10-5<br />

DPR09328

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!