2.05 MOTORS<br />

A. Refer to Division 23 Section "Motors" for general requirements for factory-installed motors.<br />

B. Motor Construction: NEMA MG 1, general purpose, continuous duty, Design B.<br />

C. Enclosure Type: Open dripproof.<br />

2.06 SOURCE QUALITY CONTROL<br />

A. Fan Performance Ratings: Establish flow rate, pressure, power, air density, speed of rotation,<br />

<strong>and</strong> efficiency by factory tests <strong>and</strong> ratings according to AMCA 210, "Laboratory Methods<br />

of Testing Fans for Rating."<br />

3.00 EXECUTION<br />

3.01 INSTALLATION<br />

A. Install power ventilators level <strong>and</strong> plumb.<br />

B. Support units using spring isolators having a static deflection of 1 inch (25 mm).<br />

1. Secure vibration <strong>and</strong> seismic controls to concrete bases using anchor bolts cast in concrete<br />

base.<br />

C. Secure roof-mounting fans to roof curbs with cadmium-plated hardware. Refer to Division 7<br />

Sections.<br />

D. Ceiling Units: Suspend units from structure; use steel wire or metal straps.<br />

E. Install units with clearances for service <strong>and</strong> maintenance.<br />

F. Label units according to requirements specified in Division 23 Section "Mechanical Identification."<br />

3.02 CONNECTIONS<br />

A. Duct installation <strong>and</strong> connection requirements are specified in other Division 23 Sections.<br />

Drawings indicate general arrangement of ducts <strong>and</strong> duct accessories. Make <strong>final</strong> duct connections<br />

with flexible connectors. Flexible connectors are specified in Division 23 Section<br />

"Duct Accessories."<br />

B. Install ducts adjacent to power ventilators to allow service <strong>and</strong> maintenance.<br />

C. Ground equipment.<br />

D. Tighten electrical connectors <strong>and</strong> terminals according to manufacturer's published torquetightening<br />

values. If manufacturer's torque values are not indicated, use those specified in<br />

UL 486A <strong>and</strong> UL 486B.<br />

3.03 FIELD QUALITY CONTROL<br />

A. Equipment Startup Checks:<br />

1. Verify that shipping, blocking, <strong>and</strong> bracing are removed.<br />

Power Ventilators 23 34 23 - 5<br />