28.04.2015 Views

final bid specs 09328.pdf - Freese and Nichols, Inc.

final bid specs 09328.pdf - Freese and Nichols, Inc.

final bid specs 09328.pdf - Freese and Nichols, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

D. All construction areas shall be <strong>final</strong>ly graded as indicated on the contract documents, or to the<br />

conditions of the site prior to construction. Grading shall bring the site back to the existing<br />

conditions as close as practical. Turfed areas shall be sodded, or hydro-mulched with<br />

matching turf. L<strong>and</strong>scaping shall be replaced with identical shrubbery, ground cover, or plants<br />

as existed. The CONTRACTOR shall be responsible for maintaining water on new turf <strong>and</strong><br />

l<strong>and</strong>scaping until established. If new turf <strong>and</strong> l<strong>and</strong>scaping is impractical due to weather<br />

conditions, CONTRACTOR shall provide satisfactory arrangements to have turf <strong>and</strong><br />

l<strong>and</strong>scaping furnished <strong>and</strong> installed at the earliest opportunity thereafter. Provide a 90-day<br />

warranty on new turf <strong>and</strong> l<strong>and</strong>scaping.<br />

E. Determine if irrigation systems exist prior to trenching <strong>and</strong> excavation. Obtain record or asbuilt<br />

drawings <strong>and</strong> locate control wiring <strong>and</strong> pressure main branches <strong>and</strong> devices. Determine<br />

by actual operation that systems are functional <strong>and</strong> repair or replace damaged systems to<br />

their original condition prior to beginning construction.<br />

2.05 LOCKING OF ELECTRICAL FACILITIES<br />

A. Install locks immediately upon the installation of the electrical facility. Provide padlocks for<br />

exterior electrical facilities subject to unauthorized entry. Furnish the OWNER with two (2)<br />

keys per lock up to a quantity of 10 keys. Furnish locks to match the OWNER's locking<br />

system.<br />

2.06 CLEAN AND ADJUST<br />

A. Remove shipping labels, dirt, paint, grease, <strong>and</strong> stains from equipment. Remove debris as it<br />

accumulates. Upon completion of work, clean electrical equipment <strong>and</strong> the entire electrical<br />

installation so that it is suitable for the OWNER's use.<br />

END OF SECTION<br />

Common Work Results for Electrical 26 05 00-5<br />

DRP09328

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!