2. Install equipment plumb <strong>and</strong> square to wall on a 4-inch thick (minimum) reinforced<br />

concrete housekeeping pad.<br />

3. Provide all interconnecting electrical power <strong>and</strong> control wiring from control panels to<br />

equipment <strong>and</strong> accessories for a complete operable systems. All exposed wiring shall be<br />

in conduit. Comply with Division 26, ELECTRICAL.<br />

4. Extend cleanouts to finished floor or wall surface. Lubricate threaded cleanout plugs with<br />

mixture of graphite <strong>and</strong> linseed oil. Ensure clearance at cleanout for rodding of drainage<br />

system.<br />

5. Encase grade cleanouts in concrete flush with grade when not located in concrete,<br />

pavement, sidewalk, etc.<br />

6. Grade cleanouts located in pavement or sidewalks shall have a brass or cast iron cover<br />

that extends to grade <strong>and</strong> a brass cap shall be installed.<br />

7. Trap all drains connected to the sanitary sewer.<br />

8. Install floor <strong>and</strong> area drains with top depressed 1/2-inch below finished floor elevation.<br />

9. In addition to cleanouts, as shown on the drawings, Contractor shall provide any<br />

additional cleanouts required by local codes <strong>and</strong> ordinances at no additional cost to the<br />

Owner.<br />

10. Outlet of plumbing vents <strong>and</strong> flues shall be located a minimum of 25'-0" from fresh air<br />

intakes. Provide offset as required.<br />

11. Relief valve discharge drain from reduced pressure backflow preventers shall be piped<br />

full outlet size down to nearest floor drain. Drain line shall terminate above floor drain<br />

with air gap unless otherwise indicated on plans.<br />

12. Prior to ordering <strong>and</strong> installing water hammer arrestors, verify that the pressure at the<br />

point of installation does not drop to below 30 psig at any time. If the pressure drops<br />

below 30 psig, do not install piston type water hammer arrestors. Install bellows type<br />

arrestors under low pressure circumstances. Provide access panel directly in front of<br />

each water hammer arrestor.<br />

C. PLUMBING FIXTURES AND CONNECTIONS<br />

1. Furnish <strong>and</strong> install plumbing fixtures, as noted on the drawings. Each fixture shall be<br />

complete with trim <strong>and</strong> fittings, including traps <strong>and</strong> supply fittings. Set fixture with close<br />

tolerance to wall <strong>and</strong> floor surfaces.<br />

2. Provide all wall mounted fixtures with floor carriers. Install <strong>and</strong> secure fixtures in place<br />

with wall supports carriers <strong>and</strong> bolts. Exposed bolts, nuts, etc. shall be stainless steel or<br />

chrome-plated brass.<br />

3. Seal fixtures to wall <strong>and</strong> floor surfaces with white mildew resistant sealant.<br />

4. Mount fixtures to Architectural drawings interior wall elevations, manufacturers<br />

recommended elevations or the requirements of the TAS.<br />

5. Provide removable insulation covering on stops <strong>and</strong> supplies <strong>and</strong> drains <strong>and</strong> P-traps on<br />

all h<strong>and</strong>icapped lavatories. All lavatories in rooms with h<strong>and</strong>icapped water closets are<br />

considered h<strong>and</strong>icapped lavatories.<br />

6. Provide accessible stops on all water supplies to fixtures <strong>and</strong> equipment.<br />

7. Provide accessible water hammer arresters on hot <strong>and</strong> cold water supplies to plumbing<br />

fixtures <strong>and</strong>/or fixture groups in accordance with St<strong>and</strong>ard PDI-WH-201. Water hammer<br />

arresters shall be as shown on diagrams <strong>and</strong> if not shown, provide for plumbing fixtures<br />

<strong>and</strong>/or fixture groups in accordance with St<strong>and</strong>ard PDI-WH-201.<br />

8. Provide drainage <strong>and</strong> vent piping run-outs to plumbing fixtures <strong>and</strong> drains, with approved<br />

trap, of sizes indicated, but in no case smaller than required by the governing Plumbing<br />

Code.<br />

D. TRENCHING, EXCAVATION AND BACKFILL<br />

1. Perform excavating <strong>and</strong> backfilling necessary for the installation of work. Shore, bail,<br />

pump <strong>and</strong> maintain all trenches dry until the work is completed. Keep trenches open until<br />

piping has been inspected, tested <strong>and</strong> approved. Take necessary precautions to protect<br />

Plumbing Systems 15400-16<br />

DPR09328