3.02 FIELD QUALITY CONTROL<br />

A. The lightning protection system will be inspected by the Engineer to determine conformance<br />

with the requirements of this specification. No part of the system shall be concealed until so<br />

authorized by the Engineer.<br />

B. The Contractor shall establish <strong>and</strong> maintain quality control for the “Lightning Protection<br />

System” installation to assure compliance with contract requirements, <strong>and</strong> shall maintain<br />

records of his quality control for all construction operations. A copy of these records <strong>and</strong><br />

Contractor tests, as well as records of corrective action taken, shall be furnished to the Owner<br />

as directed by the Engineer.<br />

C. Contractor shall obtain an Underwriters' Laboratories Master Label for the facility.<br />

1. Upon completion, an application shall be made to the Underwriters Laboratories, <strong>Inc</strong>. for<br />

inspection <strong>and</strong> certification.<br />

2. Cost for UL inspection <strong>and</strong> associated costs to obtain the UL Master Label shall be paid<br />

for by the Contractor.<br />

D. Testing of Continuity of all Conductors - A copy of these records <strong>and</strong> tests, as well as the<br />

records of corrective action taken, shall be furnished to the Owner as directed by the<br />

Engineer.<br />