26 41 13 LIGHTNING PROTECTION FOR STRUCTURES<br />

1.00 GENERAL<br />

1.01 WORK INCLUDED<br />

Furnish labor, design, materials, equipment <strong>and</strong> incidentals necessary to install a complete<br />

lightning protection system in accordance with UL 96A, NFPA 780, <strong>and</strong> this specification for<br />

protection of the Parks <strong>and</strong> Recreation Facility at the Stevens Park site. Lightning protection<br />

system shall be tied to existing <strong>and</strong> new grounding system as required.<br />

1.02 QUALITY ASSURANCE<br />

A. The system furnished under this specification shall be the st<strong>and</strong>ard product of a manufacturer<br />

regularly engaged in the production of lightning protection systems <strong>and</strong> shall be the<br />

manufacturer's latest approved design. Listing of the manufacturer in the lightning protection<br />

section of the current edition of Underwriters' Laboratories, <strong>Inc</strong>., Electrical Construction<br />

Materials List will be accepted as compliance with this requirement.<br />

B. All materials shall be copper <strong>and</strong> bronze <strong>and</strong> of the size, weight <strong>and</strong> construction to suit the<br />

application where used in accordance with UL, NFPA, NEC code requirements for this type<br />

structure <strong>and</strong> as per manufacturer's recommendations. Class I sized components may be<br />

utilized on roof levels 75 feet <strong>and</strong> below in height. Class II sized components are required for<br />

roof levels over 75 feet in height.<br />

1.03 SUBMITTALS<br />

A. Submittals shall be in accordance with Section 01 33 00, SUBMITTALS, <strong>and</strong> shall include:<br />

1. Specifications<br />

2. Catalog Sheets for All Products Provided<br />

3. Shop drawings showing type, size <strong>and</strong> location of all equipment, grounds, cable routings,<br />

etc.<br />

4. Continuity Test Report<br />

5. Copy of U.L. Master Label for the Facility<br />

1.04 STANDARDS AND REFERENCES<br />

A. Refer to Section 26 05 00, COMMON WORK RESULTS FOR ELECTRICAL, for all st<strong>and</strong>ards<br />

which apply to this section.<br />

NFPA 780 St<strong>and</strong>ard for the Installation of Lightning Protection Systems<br />

UL 96A<br />

LPI 175<br />

St<strong>and</strong>ard for Installation Requirements for Lightning Protection Systems<br />

Lightning Protection Institute St<strong>and</strong>ard of Practice<br />

Lightning Protection For Structures 26 41 13-1<br />