3.09 INTERIOR INSULATION APPLICATION SCHEDULE<br />

A. Service: A/C condensate drain piping.<br />

1. Operating Temperature: 35 to 75 deg F (2 to 38 deg C).<br />

2. Insulation Material: Flexible elastomeric.<br />

3. Insulation Thickness: ½” thickness for all pipe sizes.<br />

4. Field-Applied Jacket: None<br />

5. Vapor Retarder Required: Yes<br />

6. Finish: None<br />

3.10 EXTERIOR INSULATION APPLICATION SCHEDULE<br />

A. This application schedule is for aboveground insulation outside the building. Piping below<br />

ground requiring insulation will be provided as part of a preinsulated double wall piping system<br />

specified elsewhere.<br />

B. Service: A/C condensate drain piping.<br />

1. Operating Temperature: 35 to 75 deg F (2 to 24 deg C).<br />

2. Insulation Material: Flexible elastomeric.<br />

3. Insulation Thickness: ½” thickness for all pipe sizes.<br />

4. Field-Applied Jacket: None<br />

5. Vapor Retarder Required: Yes<br />

6. Finish: Weatherproof adhesive.<br />

END OF SECTION<br />

Pipe Insulation 23 07 19 - 6<br />

DPR09328