The <str<strong>on</strong>g>12th</str<strong>on</strong>g> <str<strong>on</strong>g>Internati<strong>on</strong>al</str<strong>on</strong>g> <str<strong>on</strong>g>Symposium</str<strong>on</strong>g> <strong>on</strong> <strong>District</strong> <strong>Heating</strong> <strong>and</strong> <strong>Cooling</strong>,September 5 th to September 7 th , 2010, Tallinn, Est<strong>on</strong>iaNEW ECONOMICAL CONNECTION SOLUTION FOR FLEXIBLE PIPING SYSTEMSChristian Engel, Gerrit-Jan BaarsThermaflex <str<strong>on</strong>g>Internati<strong>on</strong>al</str<strong>on</strong>g> Holding B.V.ABSTRACTMost Energy Companies are facing the same problem:C<strong>on</strong>necti<strong>on</strong> costs per house shall be cheaper <strong>and</strong>faster to install to reach more customers. At the sametime high level of durability <strong>and</strong> a system free ofmaintenance must be guaranteed.This paper shall give an insight of the practicalexperience with new soluti<strong>on</strong>s showing the ec<strong>on</strong>omic<strong>and</strong> ecological advantages in projects with severalEnergy companies.INTRODUCTION<strong>District</strong> <strong>Heating</strong> & <strong>Cooling</strong> networks are a major costfactor for Energy Providers <strong>and</strong> subject to permanentsearch for cost improvements.Flexible plastic pipe systems have been a major stepfor cost reducti<strong>on</strong> in low temperature networks. Withthe new EN 15632 [1] the necessary basis forcertificati<strong>on</strong> of these systems has been laid. This is amilest<strong>on</strong>e in terms of acknowledgement for flexiblesystems as a proven part of future networkdevelopments.As flow temperatures <strong>and</strong> pressures are reduced, thefield of applicati<strong>on</strong> for flexible plastic systems isincreasing. Until recently <strong>on</strong>ly a small percentage of<strong>District</strong> <strong>Heating</strong> companies have started to use plasticpipes in their networks. These were kind of pi<strong>on</strong>eerswho co-created systems together with the industry.Together with the University of Leoben, the l<strong>on</strong>g termdurability of two types of plastic medium pipes, made ofPB <strong>and</strong> PE-X were investigated. The research made byDipl.Ing. E.Kramer <strong>and</strong> Univ.Prof.Dr.J. Koppelmann [2]was based <strong>on</strong> OIT (oxygen inducti<strong>on</strong> time), tearstrength, el<strong>on</strong>gati<strong>on</strong> at break <strong>and</strong> internal pressuretests to determine the lifetime of plastic pipes at 80, 95<strong>and</strong> 110 °C. The final results were in favour for pipesmade of PB. The calculati<strong>on</strong> of the lifetime for PB pipeswas based <strong>on</strong> a typical temperature profile used insec<strong>on</strong>dary district heating networks of STEWEAG. Thelifetime expectancy was stated with 36 years.The decisi<strong>on</strong> of STEWEAG was made for PB pipes dueto their more homogenous structure, superior flexibility<strong>and</strong> allowance for welded joints. More than 250 km ofthis system have been installed since 1981 insec<strong>on</strong>dary networks operated by STEWEAG. See alsoUniv. Prof. Dr. E. Hönninger, STEWEAG [6].WHAT CAN BE SOLVED WITH FLEXIBLE PLASTICSYSTEMSApart from the high <strong>and</strong> l<strong>on</strong>g term investment costs, thefollowing main problems had to be solved as well:Corrosi<strong>on</strong> problems in c<strong>on</strong>venti<strong>on</strong>al Systems madeof Steel/PUR/PE or Cu/PUR/PE or Cu/Mineralwool/PEHeat loss due to wet <strong>and</strong> aged insulati<strong>on</strong>System shut downs for maintenance <strong>and</strong> repairThe first co-development of such a system was startedalready in 1980 by the Austrian Electricity companySTEWEAG. They were looking for a pre-insulatedpiping system as easy to install as an electric cable.Photo no.: 2 corroded steel pipe c<strong>on</strong>necti<strong>on</strong>THE NEW FLEXIBLE PIPE GENERATIONPhoto no.:1 first Flexalen installati<strong>on</strong> 1981In 2001 the Dutch Energy Provider NUON started adevelopment co-operati<strong>on</strong> with Thermaflex to createeven more flexible <strong>and</strong> moisture resistance pipingsystems. Target was again to reduce the c<strong>on</strong>necti<strong>on</strong>costs for new district heating projects. The new system261
The <str<strong>on</strong>g>12th</str<strong>on</strong>g> <str<strong>on</strong>g>Internati<strong>on</strong>al</str<strong>on</strong>g> <str<strong>on</strong>g>Symposium</str<strong>on</strong>g> <strong>on</strong> <strong>District</strong> <strong>Heating</strong> <strong>and</strong> <strong>Cooling</strong>,September 5 th to September 7 th , 2010, Tallinn, Est<strong>on</strong>iadeveloped is called FLEXALEN 600, the improvedversi<strong>on</strong> of the system used by STEWEAG. The systemc<strong>on</strong>sists of a PB (Polybutene) medium pipe <strong>and</strong> PO(Polyolefin) insulati<strong>on</strong> foam welded to a HDPE (highdensity Polyethylene) outer casing.up to d63 – there trenches can be compared to cableducts. Another fact is that c<strong>on</strong>necti<strong>on</strong>s are most of thetime <strong>on</strong>ly necessary at branches, for sticks trenchesneed to be suitable for executi<strong>on</strong> of the welding <strong>and</strong> theinsulati<strong>on</strong> process.With a new inline producti<strong>on</strong> process it was possible toweld the moisture resistant insulati<strong>on</strong> to the outercasing. The targets of a corrosi<strong>on</strong> proof <strong>and</strong> moistureresistant insulati<strong>on</strong> were met.Photo no.: 4 Steel compared to FlexalenPhoto no.:3 Flexalen 600 l<strong>on</strong>gitudinal cutFLEXALEN has been the first system to pass acertificati<strong>on</strong> <strong>and</strong> 3 rd party c<strong>on</strong>trol by KIWA, which issimilar to the new EN 15632.DECREASING INSTALLATION COSTSThe most obvious advantage is the chance to reducethe installati<strong>on</strong> time with flexible systems supplied incoil lengths of 100m <strong>and</strong> more. Compared to rigidsystems the following relative costs have been realizedin actual projectsAlthough material cost for plastic pipes are higherespecially for larger dimensi<strong>on</strong>s, the total installedsystem costs are lower, especially when using doublepipe systems wherever possible (see Photo nr. 5).BRANCH SOLUTIONSUntil now 2 types of branch soluti<strong>on</strong>s have been used.On site welded soluti<strong>on</strong> with Half-shells plus insulati<strong>on</strong>to cover (see Photo no.:4). This technology has beenused for smaller networks. Due to homogenouswelding techniques, either with polyfusi<strong>on</strong> or withelectrofucti<strong>on</strong> fittings, the branches are corrosi<strong>on</strong> free<strong>and</strong> offer the same inner diameter as the pipes.Table 1Pre-insulatedsteel pipesFLEXALENMaterial costs 100% 90–150%Installati<strong>on</strong> time 100% 20–25%Trenching 100% 50–70%Total 100% 60–85%Material costs are depending <strong>on</strong> the dimensi<strong>on</strong>ing ofthe system in the first place. In case of optimizati<strong>on</strong> ofpipe sizes <strong>and</strong> lengths according to the advantages ofPB pipes <strong>and</strong> c<strong>on</strong>necti<strong>on</strong> systems, as described later<strong>on</strong>, the material costs can be reduced for Flexalen.Installati<strong>on</strong> costs are proven in practical experiencessince almost 30 years. Flexalen systems can beinstalled 5 times faster than rigid systems.Lower costs in trenching is related to the fact thatFlexalen systems are supplied in double line systems262Photo no.: 5 Polyfusi<strong>on</strong> welded Flexalen branchPre-insulated Tees are another way to secure morereliable network quality due the reduced number ofjoints to be made <strong>on</strong> site (see Photo no.: 6). Thestraight c<strong>on</strong>necti<strong>on</strong>s are insulated with special kits witha robust slide over HDPE tube, which is sealed to theouter casing with heat shrinks.
- Page 1:
12th Inter
- Page 5 and 6:
The 12th I
- Page 7 and 8:
The 12th I
- Page 10 and 11:
The 12th I
- Page 12 and 13:
The 12th I
- Page 14 and 15:
For the case of parallel buried pip
- Page 16 and 17:
The 12th I
- Page 18 and 19:
The 12th I
- Page 20 and 21:
The 12th I
- Page 22 and 23:
The 12th I
- Page 24 and 25:
The 12th I
- Page 26 and 27:
The 12th I
- Page 28 and 29:
The 12th I
- Page 30 and 31:
The 12th I
- Page 32 and 33:
The 12th I
- Page 34 and 35:
The 12th I
- Page 36 and 37:
The 12th I
- Page 38 and 39:
The 12th I
- Page 40 and 41:
The 12th I
- Page 42 and 43:
The 12th I
- Page 44 and 45:
The 12th I
- Page 46 and 47:
The 12th I
- Page 48 and 49:
The 12th I
- Page 50 and 51:
The 12th I
- Page 52 and 53:
The 12th I
- Page 54 and 55:
The 12th I
- Page 56 and 57:
The 12th I
- Page 58 and 59:
The 12th I
- Page 60 and 61:
The 12th I
- Page 62 and 63:
The 12th I
- Page 64 and 65:
The 12th I
- Page 66 and 67:
The 12th I
- Page 68 and 69:
The 12th I
- Page 70 and 71:
The 12th I
- Page 72 and 73:
The 12th I
- Page 74 and 75:
The 12th I
- Page 76 and 77:
The 12th I
- Page 78 and 79:
The 12th I
- Page 80 and 81:
The 12th I
- Page 82 and 83:
The 12th I
- Page 84 and 85:
The 12th I
- Page 86 and 87:
The 12th I
- Page 88 and 89:
The 12th I
- Page 90 and 91:
The 12th I
- Page 92 and 93:
The 12th I
- Page 94 and 95:
The 12th I
- Page 96 and 97:
The 12th I
- Page 98 and 99:
the street the more shallow the sha
- Page 100 and 101:
The 12th I
- Page 102 and 103:
The 12th I
- Page 104 and 105:
The 12th I
- Page 106 and 107:
The 12th I
- Page 108 and 109:
The 12th I
- Page 110 and 111:
P-1P-4P-9P-7E-5P-14P-8The 1
- Page 112 and 113:
The 12th I
- Page 114 and 115:
The 12th I
- Page 116 and 117:
The 12th I
- Page 118 and 119:
The 12th I
- Page 120 and 121:
The 12th I
- Page 122 and 123:
The 12th I
- Page 124 and 125:
The 12th I
- Page 126 and 127:
The 12th I
- Page 128 and 129:
The 12th I
- Page 130 and 131:
The 12th I
- Page 132 and 133:
The 12th I
- Page 134 and 135:
The 12th I
- Page 136 and 137:
The 12th I
- Page 138 and 139:
to heating costs of 14,5 ct/kWh. Th
- Page 140 and 141:
The 12th I
- Page 142 and 143:
The 12th I
- Page 144 and 145:
The 12th I
- Page 146 and 147:
The 12th I
- Page 148 and 149:
academic access is facilitated as t
- Page 150 and 151:
The 12th I
- Page 152 and 153:
The 12th I
- Page 154 and 155:
The 12th I
- Page 156 and 157:
The 12th I
- Page 158 and 159:
The 12th I
- Page 160 and 161:
The 12th I
- Page 162 and 163:
1. CHP system operation in A2. Ther
- Page 164 and 165:
The 12th I
- Page 166 and 167:
is covered by operating HOB. In oth
- Page 168 and 169:
The 12th I
- Page 170 and 171:
The 12th I
- Page 172 and 173:
The 12th I
- Page 174 and 175:
The 12th I
- Page 176 and 177:
The 12th I
- Page 178 and 179:
The 12th I
- Page 180 and 181:
The 12th I
- Page 182 and 183:
The 12th I
- Page 184 and 185:
The 12th I
- Page 186 and 187:
The 12th I
- Page 188 and 189:
The 12th I
- Page 190 and 191:
The 12th I
- Page 192 and 193:
The 12th I
- Page 194 and 195:
The 12th I
- Page 196 and 197:
produce heat and electricity. Fluct
- Page 198 and 199:
The 12th I
- Page 200 and 201:
The 12th I
- Page 202 and 203:
The 12th I
- Page 204 and 205:
The 12th I
- Page 206 and 207:
The 12th I
- Page 208 and 209:
The 12th I
- Page 210 and 211:
To assure that the temperatures mea
- Page 212 and 213: The 12th I
- Page 214 and 215: The 12th I
- Page 216 and 217: The 12th I
- Page 218 and 219: The 12th I
- Page 220 and 221: production and provide for marginal
- Page 222 and 223: The 12th I
- Page 224 and 225: The 12th I
- Page 226 and 227: The 12th I
- Page 228 and 229: The 12th I
- Page 230 and 231: The 12th I
- Page 232 and 233: The 12th I
- Page 234 and 235: The 12th I
- Page 236 and 237: The 12th I
- Page 238 and 239: The 12th I
- Page 240 and 241: The 12th I
- Page 242 and 243: In addition, it can also be observe
- Page 244 and 245: The 12th I
- Page 246 and 247: owner is normally only interested i
- Page 248 and 249: The 12th I
- Page 250 and 251: The 12th I
- Page 252 and 253: The 12th I
- Page 254 and 255: The 12th I
- Page 256 and 257: The 12th I
- Page 258 and 259: The 12th I
- Page 260 and 261: The 12th I
- Page 264 and 265: The 12th I
- Page 266 and 267: The 12th I
- Page 268 and 269: The 12th I
- Page 270 and 271: The 12th I
- Page 272 and 273: The 12th I
- Page 274 and 275: The 12th I
- Page 276 and 277: The 12th I
- Page 278 and 279: The 12th I
- Page 280 and 281: The 12th I
- Page 282 and 283: The 12th I
- Page 284 and 285: The 12th I
- Page 286 and 287: The 12th I
- Page 288 and 289: The 12th I
- Page 290 and 291: Stockholm district heating system a
- Page 292 and 293: The 12th I
- Page 294 and 295: The 12th I
- Page 296 and 297: The 12th I
- Page 298 and 299: The 12th I
- Page 300 and 301: The 12th I
- Page 302 and 303: The 12th I
- Page 304 and 305: The 12th I
- Page 306 and 307: The 12th I
- Page 308 and 309: The 12th I
- Page 310 and 311: The 12th I
- Page 312 and 313:
The 12th I
- Page 314 and 315:
The values presented do of course l
- Page 316 and 317:
The 12th I
- Page 318 and 319:
The 12th I
- Page 320 and 321:
The 12th I
- Page 322 and 323:
The 12th I
- Page 324 and 325:
The 12th I
- Page 326:
The 12th I