11.07.2015 Views

12th International Symposium on District Heating and Cooling

12th International Symposium on District Heating and Cooling

12th International Symposium on District Heating and Cooling

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The <str<strong>on</strong>g>12th</str<strong>on</strong>g> <str<strong>on</strong>g>Internati<strong>on</strong>al</str<strong>on</strong>g> <str<strong>on</strong>g>Symposium</str<strong>on</strong>g> <strong>on</strong> <strong>District</strong> <strong>Heating</strong> <strong>and</strong> <strong>Cooling</strong>,September 5 th to September 7 th , 2010, Tallinn, Est<strong>on</strong>iaREFERENCES[1] A. D. Heidweiller, B. C. Van Leeuwen <strong>and</strong> C. L.Paarmann, ―Systeemstudie StadsverwarmingPurmerend‖, Tebodin B.V., Den Haag, theNetherl<strong>and</strong>s (2006)[2] A. E. Klop, B. P. Mensink <strong>and</strong> C. F. Dervis,―Transitiestudie Stadsverwarming Purmerend‖,DWA Installatie- en Energieadvies, Bodegraven,the Netherl<strong>and</strong>s (2009)Fig. 7 Required heat producti<strong>on</strong> with SlimNet[3] A. L.J.A.M. Hendriksen <strong>and</strong> B. R.A. Br<strong>and</strong>,―Onderzoek naar storingen in hetstadsverwarmingnet van Purmerend (report 034-APD-2009-0021)‖, TNO Bouw en Ondergr<strong>on</strong>d,Apeldoorn, the Netherl<strong>and</strong>s (2009)[4] A. M. den Burger <strong>and</strong> B. D. Heidweiller,―Deelrapport 5: Warmteverliezen enmeetverschillen‖, Tebodin B.V., Den Haag, theNetherl<strong>and</strong>s (2005)[5] F. Dervis, ―Nulmeting duurzaamheid SVP‖, DWAInstallatie- en Energieadvies, Bodegraven, theNetherl<strong>and</strong>s (2009)Fig. 8 CO 2 savings with SlimNetReplacing the post-insulated steel <strong>and</strong> PEX pipestogether with a maintenance program including leakdetecti<strong>on</strong> will have a positive effect <strong>on</strong> the waterreplenishment. The leak detecti<strong>on</strong> acti<strong>on</strong>s have alreadyresulted in a 30.285 m³ replenishment in 2009, which isa 7% reducti<strong>on</strong> compared to 2008.It is expected that al measures will result in a 50%reducti<strong>on</strong> in 2015. Unplanned repairs will also reduce50% <strong>and</strong> c<strong>on</strong>sequently is expected to improvesignificantly.[6] J.J. Ribberink, ―Lifetime predicti<strong>on</strong> of PB pipesused in a district heating network‖, KIWA N.V.Certificati<strong>on</strong> <strong>and</strong> inspecti<strong>on</strong>, Rijswijk, theNetherl<strong>and</strong>s (2009)[7] A. D. A. Kaminski <strong>and</strong> B. M. K. Jensen,―Introducti<strong>on</strong> to thermal <strong>and</strong> fluid engineering‖,John Wiley& S<strong>on</strong>s, Hoboken, USA (2005), pp 103[8] T.A. Østergaard, ―New dimensi<strong>on</strong>s for O16‖,COWI A/S, Aarhus, Denmark (2010)[9] A. B. Zito<strong>on</strong>y <strong>and</strong> B. E. Roukema, ―Rapportinregelstatus <strong>on</strong>derstati<strong>on</strong>s StadsverwarmingPurmerend 10.001.V2‖, Roukema B.V., Gr<strong>on</strong>ingen,the Netherl<strong>and</strong>s (2010)59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!