11.07.2015 Views

12th International Symposium on District Heating and Cooling

12th International Symposium on District Heating and Cooling

12th International Symposium on District Heating and Cooling

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The <str<strong>on</strong>g>12th</str<strong>on</strong>g> <str<strong>on</strong>g>Internati<strong>on</strong>al</str<strong>on</strong>g> <str<strong>on</strong>g>Symposium</str<strong>on</strong>g> <strong>on</strong> <strong>District</strong> <strong>Heating</strong> <strong>and</strong> <strong>Cooling</strong>,September 5 th to September 7 th , 2010, Tallinn, Est<strong>on</strong>iaPhoto no.: 9 Installati<strong>on</strong> of Flexalen T-LinkPhoto no.:12 Welding of T-Link to the next secti<strong>on</strong>All experiences so far have been very positive <strong>and</strong>have led to further applicati<strong>on</strong>s already.RENOVATION IN PURMERENTPhoto no.: 10 Installati<strong>on</strong> of Flexalen T-LinkThese 2 photos (no 8 <strong>and</strong> 9) dem<strong>on</strong>strate how easy itwas to slide the c<strong>on</strong>necti<strong>on</strong> into the duct under thehouse.Also further c<strong>on</strong>necti<strong>on</strong>s between the pre-fabricatedsecti<strong>on</strong>s were made before sliding the entire systemunder the house. Only the last c<strong>on</strong>necti<strong>on</strong> had to bemade in the duct. See also photos no.:11 & 12.The situati<strong>on</strong> of the current district heating network inPurmerend (Energy supplier StadsverwarmingPurmerend) is very critical. Due to higher ground waterlevels than expected the current metal pipe systemshave corroded <strong>and</strong> need to be replaced.As the network has been installed under the basementof the attached housing schemes, the space for theinstaller is very tight <strong>and</strong> it is not allowed to use anysteel welding process in these circumstances. FlexalenT-Link has been identified to be the ideal soluti<strong>on</strong>.Purmerend has ordered this system for 300 housec<strong>on</strong>necti<strong>on</strong>s for 2010 already.For the renovati<strong>on</strong> market in the Netherl<strong>and</strong>s, thissoluti<strong>on</strong> has shown big advantages. This soluti<strong>on</strong> isnow available for Energy Provider worldwide not justfor renovati<strong>on</strong>, but also for new networks.PRE-FABRICATED NETWORKS FOR NEWPROJECTSPhoto no.: 11 pipes under the buildingThe c<strong>on</strong>diti<strong>on</strong>s in new building situati<strong>on</strong>s are mucheasier <strong>and</strong> this soluti<strong>on</strong> can help to reduce thec<strong>on</strong>necti<strong>on</strong> costs.Both Dutch Energy Provider, Eneco <strong>and</strong> Nu<strong>on</strong> areinvestigating this new soluti<strong>on</strong> for new building projects.264

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!