11.07.2015 Views

12th International Symposium on District Heating and Cooling

12th International Symposium on District Heating and Cooling

12th International Symposium on District Heating and Cooling

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The <str<strong>on</strong>g>12th</str<strong>on</strong>g> <str<strong>on</strong>g>Internati<strong>on</strong>al</str<strong>on</strong>g> <str<strong>on</strong>g>Symposium</str<strong>on</strong>g> <strong>on</strong> <strong>District</strong> <strong>Heating</strong> <strong>and</strong> <strong>Cooling</strong>,September 5 th to September 7 th , 2010, Tallinn, Est<strong>on</strong>iaprimary side defined by DH provider by means of flowrestrictor or by available differential pressure in DHnetwork. To reduce tap delay <strong>on</strong> primary side, c<strong>on</strong>trolc<strong>on</strong>cepts with by-pass, avoiding cooling of DH water inbranch pipes <strong>and</strong> substati<strong>on</strong>s, <strong>and</strong> thus reducingsubstantially waiting time for DHW are available. Thereare two c<strong>on</strong>cepts of by-pass in relati<strong>on</strong> to the heatexchanger: external <strong>and</strong> internal by-pass (see Fig. 1). Incase of external by-pass, DH water enters substati<strong>on</strong>,but not enters heat exchanger <strong>and</strong> is sent back to DHreturn pipe <strong>and</strong> thus branch pipe is kept <strong>on</strong> desiredtemperature. Desired temperature is c<strong>on</strong>trolled bythermostatic valve situated in by-pass loop. Increasedlevel of comfort expressed by reduced tap delay can beadjusted independently <strong>on</strong> temperature of DHW <strong>on</strong>sec<strong>on</strong>dary side.Fig. 1 Different by-pass strategies for IHEU: left - no-by pass; middle - external by-pass (cold HEX); right - internal by-pass(hot HEX)The set-point temperature of external by-pass isalways compromise between insufficient cooling of DHwater <strong>and</strong> additi<strong>on</strong>al heat c<strong>on</strong>sumed by customer <strong>and</strong>reduced waiting time for DHW. In case of operati<strong>on</strong> ofspace heating system, the functi<strong>on</strong> of by-pass is tosome extend overtaken by space heating loop <strong>and</strong>thus heat for ―by-pass‖ operati<strong>on</strong> is not wasted <strong>and</strong>temperature of DH water returning to DH network iscooled sufficiently..In case of internal by-pass, by-passflow is passing through heat exchanger <strong>and</strong> keep itwarm (see Fig. 1). The benefit of this soluti<strong>on</strong> is evenmore reduced tap delay than in case of externalby-pass, but <strong>on</strong> the other h<strong>and</strong>, since heat exchangeris kept warm, internal by-pass soluti<strong>on</strong> has additi<strong>on</strong>alheat losses. If substati<strong>on</strong> is installed in room with needof space heating, heat losses are c<strong>on</strong>sidered <strong>on</strong>lyoutside of heating seas<strong>on</strong>.C<strong>on</strong>trary to external by-pass soluti<strong>on</strong>, where it is not soimportant if space heating loop is installed in series orin parallel to DHW heat exchanger, in case of internalby-pass it is in importance. If space heating loop isc<strong>on</strong>nected in parallel to DHW heat exchanger intraditi<strong>on</strong>al way, by-pass water just pass through DHWheat exchanger <strong>and</strong> is sent back to DH network withstill high return temperature, without any other use. Ifspace heating loop is c<strong>on</strong>nected in series to DHW heatexchanger or in parallel but with possibility to sent bypasswater flown through internal by-pass to spaceheating loop (see Fig. 2), this soluti<strong>on</strong> provides highlevel of comfort for users as well as proper use of heatneeded for by-pass operati<strong>on</strong>.63Fig. 2 Combined by-pass c<strong>on</strong>cept, with possibility of useby-pass flow in space heating loopIn order to run by-pass without drawback of insufficientcooling of DH water <strong>and</strong> wasted heat also outside ofheating seas<strong>on</strong>, it is proposed to use by-pass flow forfloor heating, installed in bathroom <strong>and</strong> operate it allyear. From preliminary calculati<strong>on</strong>s it looks, that flowneeded to keep bathroom floor surface temperature <strong>on</strong>24°C will be enough as by-pass flow. C<strong>on</strong>sidering theuse of renewable sources of heat, the problem ofinsufficiently cooled DH water is related to reducedefficiency of these sources <strong>and</strong> whole year using offloor heating for comfort in bathroom is reas<strong>on</strong>able.Supply – supply recirculati<strong>on</strong>As an alternative soluti<strong>on</strong> for customers who d<strong>on</strong>‘twant to use whole year bathroom floor heating,soluti<strong>on</strong> called supply-supply recirculati<strong>on</strong> is apossibility how to use benefits of by-pass withoutwhole year heating of bathroom. In this case, district

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!