13.07.2015 Views

TROLL 9500 Operator's Manual - Geotech Environmental Equipment

TROLL 9500 Operator's Manual - Geotech Environmental Equipment

TROLL 9500 Operator's Manual - Geotech Environmental Equipment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 20: Low-Flow MonitoringFlow-Sense Wizard Input1. The first input screen provides for entry of specific details about theproject. This information will be included in the output report. TheProject Name and Site Name will appear in the output file name.3. In the next screen, enter details about the pump and tubing(tubing information is used in later volume calculations). Ifcreating a template, estimate the tubing length and pumpplacement.31Click or tap Next to continue.2. In the next screen, enter information about the well. This informationwill be included in the output report. The Well ID will appear inthe output file name.2Click or tap Next to continue.The next screen requests pumping information4. Final pumping rate: Enter in milliliters per minute. If creating atemplate, accept the default or estimate the pumping rate.5. Total volume—Auto Calculated Value: This is the softwarecalculatedvolume of the cup (flow cell) and tubing, less thedisplacement of installed sensors.45Click or tap Next to continue.To specify a different volume, clear the “Auto” check box, andenter the new volume (mL).<strong>TROLL</strong> <strong>9500</strong> Operator’s <strong>Manual</strong>137 0095110 rev. 007 01/09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!