04.08.2013 Views

FMS - GAIL

FMS - GAIL

FMS - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

uptime of the installed Systems / devices / equipments & Network for<br />

optimum utilization of resources and availability of various services to endusers.<br />

Bidder is required to go through all the terms & conditions of this Tender<br />

document carefully and shall confirm the compliances of all clauses of<br />

tender by submitting Compliance confirmation statement of Tender<br />

document as per Annexure-J.<br />

Bidder must quote basic rates for all the Services as per the format<br />

given under the Schedule of Rates (SOR) section of bid document.<br />

The quoted unit rates of SOR shall be inclusive of all the service<br />

charges, spare parts’ cost, transportation, packing, lodging &<br />

boarding & logistic support and all applicable Taxes & Duties except<br />

Service Tax & Cess thereon.<br />

Service Tax and Cess thereon, if applicable, shall be indicated<br />

separately in the SOR and shall be payable extra at actuals on<br />

submission of documentary evidence/invoice.<br />

Bidder shall also quote on lumpsum basis, including all taxes & duties for<br />

supply of genuine & recommended SMF type batteries of various types of<br />

UPSs, Printer consumables, LAN Cablling items, other optional items and<br />

supply/services for repair of cut of OFC segments as indicated in the SOR<br />

tables ‘I’, ‘J’ & ‘K’. The cost of total quantity as indicated in Tables ‘I’,<br />

‘J’ & ‘K’ of SOR will also be taken into account for cost comparison<br />

purpose.<br />

Bidder shall supply the UPS Batteries, Printer consumables, LAN Cablling<br />

items, other optional items at respective sites as and when required by the<br />

site’s and payment for total cost of the UPS Batteries, Printer<br />

consumables, LAN Cabling items, other optinal items and<br />

supply/services for Repair of cut of OFC segments, if any, will be<br />

released along with subsequent quarterly bill, depending on numbers<br />

of items supplied / replaced / repaired at various locations, certified by<br />

Engineer-In-Charge of sites. Supplied items will be under one year warranty<br />

from date of acceptance by <strong>GAIL</strong>. The date of change of UPS batteries will<br />

be marked on the UPS.<br />

The rates quoted shall be firm and bidder’s request for changing his quoted<br />

rates after the bidding stage shall be rejected by <strong>GAIL</strong>. A photocopy of<br />

the SOR with prices blanked off shall be submitted along with the<br />

un-priced bid, failing which <strong>GAIL</strong> reserves the right to reject the bid.<br />

There shall be no deviation or Option marked in the Priced Bid. (This<br />

shall enable <strong>GAIL</strong> to check if all the items have been quoted and no<br />

deviation sought before opening of price bid).<br />

<strong>GAIL</strong> reserves the right to reject any / all the bids without assigning any<br />

reason whatsoever.<br />

122

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!