FMS - GAIL
FMS - GAIL
FMS - GAIL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
uptime of the installed Systems / devices / equipments & Network for<br />
optimum utilization of resources and availability of various services to endusers.<br />
Bidder is required to go through all the terms & conditions of this Tender<br />
document carefully and shall confirm the compliances of all clauses of<br />
tender by submitting Compliance confirmation statement of Tender<br />
document as per Annexure-J.<br />
Bidder must quote basic rates for all the Services as per the format<br />
given under the Schedule of Rates (SOR) section of bid document.<br />
The quoted unit rates of SOR shall be inclusive of all the service<br />
charges, spare parts’ cost, transportation, packing, lodging &<br />
boarding & logistic support and all applicable Taxes & Duties except<br />
Service Tax & Cess thereon.<br />
Service Tax and Cess thereon, if applicable, shall be indicated<br />
separately in the SOR and shall be payable extra at actuals on<br />
submission of documentary evidence/invoice.<br />
Bidder shall also quote on lumpsum basis, including all taxes & duties for<br />
supply of genuine & recommended SMF type batteries of various types of<br />
UPSs, Printer consumables, LAN Cablling items, other optional items and<br />
supply/services for repair of cut of OFC segments as indicated in the SOR<br />
tables ‘I’, ‘J’ & ‘K’. The cost of total quantity as indicated in Tables ‘I’,<br />
‘J’ & ‘K’ of SOR will also be taken into account for cost comparison<br />
purpose.<br />
Bidder shall supply the UPS Batteries, Printer consumables, LAN Cablling<br />
items, other optional items at respective sites as and when required by the<br />
site’s and payment for total cost of the UPS Batteries, Printer<br />
consumables, LAN Cabling items, other optinal items and<br />
supply/services for Repair of cut of OFC segments, if any, will be<br />
released along with subsequent quarterly bill, depending on numbers<br />
of items supplied / replaced / repaired at various locations, certified by<br />
Engineer-In-Charge of sites. Supplied items will be under one year warranty<br />
from date of acceptance by <strong>GAIL</strong>. The date of change of UPS batteries will<br />
be marked on the UPS.<br />
The rates quoted shall be firm and bidder’s request for changing his quoted<br />
rates after the bidding stage shall be rejected by <strong>GAIL</strong>. A photocopy of<br />
the SOR with prices blanked off shall be submitted along with the<br />
un-priced bid, failing which <strong>GAIL</strong> reserves the right to reject the bid.<br />
There shall be no deviation or Option marked in the Priced Bid. (This<br />
shall enable <strong>GAIL</strong> to check if all the items have been quoted and no<br />
deviation sought before opening of price bid).<br />
<strong>GAIL</strong> reserves the right to reject any / all the bids without assigning any<br />
reason whatsoever.<br />
122