(j) Few Systems / Peripherals, covered under MSS / <strong>FMS</strong> are installed at<br />

the residence of senior officers of <strong>GAIL</strong>. If required, Contractor shall<br />

be required to attend the maintenance calls at their residence<br />

through resident Support engineers. <strong>GAIL</strong> shall provide a list of such<br />

PCs / Peripherals to the Contractor.<br />

(k) At each site, the contractor shall maintain device drivers, Patches,<br />

software tools, such as data recovery tools from crashed Hard Disk<br />

or mistakenly crashed hard disk, Registry maintenance tools and any<br />

required tools and utilities on Central Help Desk for making it<br />

available on LAN /WAN all across <strong>GAIL</strong> locations. This activity shall<br />

be completed within one month of commencement of MSS & <strong>FMS</strong><br />

contract.<br />

(l) In case of Hard Disk failure, the contractor shall make all attempts<br />

possible to retrieve the data & transfer to new Hard disk. Contractor<br />

shall make available required Data recovery tools at all sites. In<br />

case, it is not possible to recover the data using the tool, the<br />

contractor should recover the data through reputed Data Recovery<br />

Agencies. In case the Data Recovery Agencies also fails to recover<br />

the data, the report from the Agency has to be produced to <strong>GAIL</strong>.<br />

(m) <strong>GAIL</strong> will also make the best efforts to recover the data from any<br />

other external agency and data recovery charges so incurred by<br />

<strong>GAIL</strong> will be deducted from the subsequent quarterly bill of the<br />

contractor.<br />

2.1.5 PREVENTIVE MAINTENANCE (PM)<br />

(a) The contractor shall follow a strict preventive maintenance schedule for<br />

all Systems covered under MSS Supports and carry out the same at<br />

least once in a quarter. The contractor must ensure that he maintains a<br />

datasheet for each machine available, which will contain the<br />

configuration of each machine and dates of completion of various<br />

preventive maintenance activities.<br />

(b) The Contractor shall carry out Preventive Maintenance as per check list<br />

format given under Annexure-‘H’ and get it signed from the individual IT<br />

Users. The contractor shall submit / maintain record of completed service<br />

report, alongwith signature obtained from users ensuring satisfactory<br />

completion of jobs. The Contractor shall submit these reports for<br />

verification by the engineer-In-charge at the time of submission of their<br />

quarterly invoice to <strong>GAIL</strong>.<br />

(c) Internal cleaning of all the systems, sub-systems & peripherals, covered<br />

under the contract shall be carried out by the Contractor during<br />

Preventive Maintenance using portable vacuum cleaner / tools / brush /<br />

cleaning agents etc.<br />

(d) During quarterly PM of Machines, in addition to attending the specific<br />

complaints, Contractor will make suitable use of trouble shooting /<br />

diagnostics Software tools, installed and available with each Desktop /<br />

laptop, to reconfirm the hardware configuration of each PC / Peripherals<br />

149