04.08.2013 Views

FMS - GAIL

FMS - GAIL

FMS - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

esolution of similar future problems faced in MSS/ <strong>FMS</strong>. Apart from the<br />

reference of the Contractor personnel, the same can be referred to by <strong>GAIL</strong><br />

personnel also as a pre-emptive precaution also.<br />

2.8 ADDITIONS / DELETIONS OF SYSTEMS<br />

(a) Location-wise installation details of IT System & Peripherals along<br />

with MSS / <strong>FMS</strong> indicative commencement dates have been specified at<br />

Annexure ‘A’ & ‘AB’.<br />

(b) Details of Servers & Networking devices & associated Peripherals<br />

along with MSS / <strong>FMS</strong> indicative commencement dates have been<br />

specified at Annexure–B & Annexure-C.<br />

(c) Presently some of the networking equipments, Servers, PCs,<br />

associated peripherals are under warranty with different vendors up to<br />

different point of time. Comprehensive MSS & <strong>FMS</strong> for these equipments<br />

will start on the expiry of warranty period. <strong>GAIL</strong> reserves the right to add<br />

/ delete any networking equipment, computer (s) or peripherals (s), as<br />

and when required to the Scope of Work.<br />

(d) Any addition / deletion of the equipment for MSS & <strong>FMS</strong> shall be<br />

done by the respective IT In-charges of site offices for which rates are<br />

available in the contract at any time during the contract period on prorata<br />

basis, irrespective of location within <strong>GAIL</strong>.<br />

(e) In case non-availability of MSS rates in the contract for System of<br />

same type, make & model, new System will be added based on MSS rates<br />

of nearest similar / equivalent make / model of that type.<br />

(f) The additional cost will be worked out based on quantity as well as<br />

corresponding period for which MSS & <strong>FMS</strong> coverage is required for these<br />

Machines. The maintenance of these additional machines shall be carried<br />

out under the same terms & conditions agreed therein in the contract. The<br />

total contract value will get modified on a pro-rata basis. Such revised<br />

charges shall become effective/ payable from the date of addition/<br />

deletion.<br />

(g) As per <strong>GAIL</strong> policy, time to time old Servers, Networking devices,<br />

Desktop, printers & associated peripherals required to be phased out and<br />

replaced by new / latest IT devices, having three years Warranty Support<br />

from the Supplier. In that case, phased out IT devices will be excluded<br />

from the MSS / <strong>FMS</strong> and newly installed IT devices will be covered only<br />

for <strong>FMS</strong> support. The RSE at respective locations will assist in Porting the<br />

program / data from phased out System to the new system and<br />

subsequently provide <strong>FMS</strong> support of all those installed IT Assets.<br />

(h) <strong>GAIL</strong> is free to move the IT Systems / Sub-systems to any of its<br />

existing / new sites in India. The Contractor shall assist, install and<br />

maintain the Systems at its new locations, as per scope of contract,<br />

irrespective of its earlier coverage in the MSS. The Contractor shall not<br />

levy and claim any extra maintenance charges, other than those already<br />

agreed in the contract, on the systems being shifted & installed at new<br />

location.<br />

170

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!