04.08.2013 Views

FMS - GAIL

FMS - GAIL

FMS - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(c) After repair, the Contractor shall bring the machine to its<br />

satisfactory & acceptable working condition. Sub standard / repaired<br />

Spare parts in lieu of irreparable components will not be accepted at<br />

<strong>GAIL</strong> as a spare parts replacement.<br />

(d) The outside cleaning of all the Systems / Sub-systems will be<br />

done at least once a quarter. Cleaning of internal parts of the<br />

Systems will be done by the contractor during preventive<br />

maintenance. Required portable vacuum cleaner, brush, tools and<br />

cleaning agent / material etc. shall be arranged by the contractor.<br />

The external cleaning shall be done by using standard cleaning<br />

agents which do not cause any damage to the Systems / Subsystems.<br />

(e) Contractor will educate the users at <strong>GAIL</strong> regarding the best<br />

practices of using the PCs like not sharing the hard disk, protecting<br />

the PC with Screen saver, setting of clock as per IST etc. The users<br />

will be educated and trained so as to ensure the proper<br />

implementation of the available feature available with Desktop /<br />

laptop.<br />

(f) Contractor shall ensure that all the PCs are configured for auto<br />

updating of the VIRUS signature from a central server (provided by<br />

<strong>GAIL</strong>) having the latest active VIRUS definitions at respective<br />

locations. Such VIRUS updations shall be ensured & carried out by<br />

the Contractor on all the PCs on a weekly basis.<br />

(g) The Contractor shall make his own arrangements for bringing<br />

the spare parts, software tools & testing equipments for providing<br />

the services. The Contractor shall maintain sufficient inventory of<br />

frequently required OEM / OEM certified / genuine spare parts like<br />

Motherboard, CPU, RAM, DAT Driver, CD Drive, Power supply, Hard<br />

disks, Keyboard, Monitors, CRTs, Mouse, device drivers, utility<br />

software, various cables, connectors and other spare parts of<br />

Servers & Networking devices etc., to ensure fulfillment of SLR.<br />

However, <strong>GAIL</strong> will extend the facility of storage of these items<br />

under lock & key, at the risk of the Contractor at major office / plant<br />

locations. <strong>GAIL</strong> will not be held responsible for any missing standby<br />

Systems / spare parts / tools etc. from the inventory of the<br />

contractor.<br />

(h) The Contractor shall ensure uninterrupted availability of OEM /<br />

OEM certified / genuine spare parts of PCs, Printers, Scanners, UPS<br />

& other Peripherals. Contractor must be having sufficient expertise &<br />

required resources available for prompt maintaining / servicing /<br />

repairing of PCs & Peripherals. A comprehensive list of such spares<br />

will be provided to the respective IT in charge.<br />

(i) If any System / Sub-system give repeated / recurring problems,<br />

resulting in recurring failure of the System then the system shall be<br />

immediately replaced by the Contractor with same make & similar or<br />

higher model / configuration System, acceptable to IT In-charges of<br />

respective sites.<br />

148

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!