(c) After repair, the Contractor shall bring the machine to its<br />
satisfactory & acceptable working condition. Sub standard / repaired<br />
Spare parts in lieu of irreparable components will not be accepted at<br />
<strong>GAIL</strong> as a spare parts replacement.<br />
(d) The outside cleaning of all the Systems / Sub-systems will be<br />
done at least once a quarter. Cleaning of internal parts of the<br />
Systems will be done by the contractor during preventive<br />
maintenance. Required portable vacuum cleaner, brush, tools and<br />
cleaning agent / material etc. shall be arranged by the contractor.<br />
The external cleaning shall be done by using standard cleaning<br />
agents which do not cause any damage to the Systems / Subsystems.<br />
(e) Contractor will educate the users at <strong>GAIL</strong> regarding the best<br />
practices of using the PCs like not sharing the hard disk, protecting<br />
the PC with Screen saver, setting of clock as per IST etc. The users<br />
will be educated and trained so as to ensure the proper<br />
implementation of the available feature available with Desktop /<br />
laptop.<br />
(f) Contractor shall ensure that all the PCs are configured for auto<br />
updating of the VIRUS signature from a central server (provided by<br />
<strong>GAIL</strong>) having the latest active VIRUS definitions at respective<br />
locations. Such VIRUS updations shall be ensured & carried out by<br />
the Contractor on all the PCs on a weekly basis.<br />
(g) The Contractor shall make his own arrangements for bringing<br />
the spare parts, software tools & testing equipments for providing<br />
the services. The Contractor shall maintain sufficient inventory of<br />
frequently required OEM / OEM certified / genuine spare parts like<br />
Motherboard, CPU, RAM, DAT Driver, CD Drive, Power supply, Hard<br />
disks, Keyboard, Monitors, CRTs, Mouse, device drivers, utility<br />
software, various cables, connectors and other spare parts of<br />
Servers & Networking devices etc., to ensure fulfillment of SLR.<br />
However, <strong>GAIL</strong> will extend the facility of storage of these items<br />
under lock & key, at the risk of the Contractor at major office / plant<br />
locations. <strong>GAIL</strong> will not be held responsible for any missing standby<br />
Systems / spare parts / tools etc. from the inventory of the<br />
contractor.<br />
(h) The Contractor shall ensure uninterrupted availability of OEM /<br />
OEM certified / genuine spare parts of PCs, Printers, Scanners, UPS<br />
& other Peripherals. Contractor must be having sufficient expertise &<br />
required resources available for prompt maintaining / servicing /<br />
repairing of PCs & Peripherals. A comprehensive list of such spares<br />
will be provided to the respective IT in charge.<br />
(i) If any System / Sub-system give repeated / recurring problems,<br />
resulting in recurring failure of the System then the system shall be<br />
immediately replaced by the Contractor with same make & similar or<br />
higher model / configuration System, acceptable to IT In-charges of<br />
respective sites.<br />