Schedules, Notices, Correspondence, operating and maintenance<br />

Instructions, DRAWINGS, or any other writing shall be written in<br />

English language. The Metric System of measurement shall be used<br />

in the CONTRACT unless otherwise specified.<br />

50 Transfer of title: 50.1 The title of Ownership of supplies furnished by the CONTRACTOR<br />

shall not pass on to the EMPLOYER for all Supplies till the same are<br />

finally accepted by the EMPLOYER after the successful completion<br />

of PERFORMANCE TEST and GUARANTEE TEST and issue of<br />

FINAL CERTIFICATE.<br />

50.2 However, the EMPLOYER shall have the lien on all such works<br />

performed as soon as any advance or progressive payment is made<br />

by the EMPLOYER to the CONTRACTOR and the CONTRACTOR<br />

shall not subject these works for use other than those intended under<br />

this CONTRACT.<br />

51 Release of information: 51.1 The CONTRACTOR shall not communicate or use in advertising,<br />

publicity, sales releases or in any other medium, photographs, or<br />

other reproduction of the Work under this CONTRACT or description<br />

of the site dimensions, quantity , quality or other information,<br />

concerning the Work unless prior written permission has been<br />

obtained from the EMPLOYER.<br />

52<br />

53<br />

Brand names:<br />

Completion of contract:<br />

52.1 The specific reference in the SPECIFICATIONS and documents to<br />

any material by trade name, make or catalogue number shall be<br />

construed as establishing standard or quality and performance and<br />

not as limited competition. However, TENDERER may offer other<br />

similar equipments provided it meets the specified standard design<br />

and performance requirements.<br />

53.1 Unless otherwise terminated under the provisions of any other<br />

relevant clause, this CONTRACT shall be deemed to have been<br />

completed at the expiration of the PERIOD OF LIABILITY as<br />

provided for under the CONTRACT.<br />

54 Spares: 54.1 The CONTRACTOR shall furnish to the EMPLOYER all spares<br />

required for COMMISSIONING of the plants, recommendatory<br />

and/or mandatory spares, which are required essential by the<br />

manufacturer/supplier. The same shall be delivered at SITE,<br />

3(Three) months before COMMISSIONING.<br />

Also the CONTRACTOR should furnish the manufacturing drawings<br />

for fast wearing spares.<br />

54.2 The CONTRACTOR guarantees the EMPLOYER that before the<br />

manufacturers of the equipments, plants and machineries go out of<br />

production of spare parts for the equipment furnished and erected by<br />

him, he shall give at least twelve (12) months' advance notice to the<br />

EMPLOYER, so that the latter may order his requirement of spares<br />

in one lot, if he so desires.<br />

SECTION-V Performance of Work<br />

55 Execution of work: 55.1 All the Works shall be executed in strict conformity with the<br />

provisions of the CONTRACT Documents and with such<br />

explanatory detailed drawings, specification and instructions as<br />

may be furnished from time to time to the CONTRACTOR by the<br />

ENGINEER-IN-CHARGE whether mentioned in the CONTRACT<br />

77