FMS - GAIL
FMS - GAIL
FMS - GAIL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
50.0 Transfer of Title<br />
51.0 Release of Information<br />
52.0 Brand Names<br />
53.0 Completion of Contract<br />
54.0 Spares<br />
SECTION-V (PERFORMANCE OF WORK)<br />
55.0 Execution of Work<br />
56.0 Co-ordination and Inspection of work<br />
57.0 Work in Monsoon & Dewatering<br />
58.0 Work on Sundays & Holidays<br />
59.0 General Conditions for construction &<br />
Erection Work<br />
60.0 Alterations in specification, Design &<br />
Extra Work<br />
61.0 Drawings to be supplied by the Employer<br />
62.0 Drawings to be supplied by the Contractor<br />
63.0 Setting out works<br />
64.0 Responsibility for Levels and Alignment<br />
65.0 Materials to be supplied by contractor<br />
66.0 Stores supplied by Employer<br />
67.0 Conditions for issue of material<br />
68.0 Materials Procured with assistance of<br />
Employer/Return of surplus<br />
69.0 Materials obtained from dismantling<br />
70.0 Articles of Value found<br />
71.0 Discrepancies between instructions<br />
72.0 Action where no specification is issued<br />
73.0 Inspection of Works<br />
74.0 Tests for Quality of Works<br />
75.0 Samples for approval<br />
76.0 Action and Compensation in case of bad work<br />
77.0 Suspension of Work<br />
78.0 Employer may do part of work<br />
79.0 Possession prior to completion<br />
80.0 Twelve months period of liability from the<br />
date of issue of completion certificate<br />
80.3 Limitation of Liability<br />
81.0 Care of Works<br />
81.1 Defects prior to taking over<br />
81.2 Defects after taking over<br />
82.0 Guarantee/Transfer of Guarantee<br />
83.0 Training of Employer's personnel<br />
84.0 Replacement of Defective parts & materials<br />
85.0 Indemnity<br />
86.0 Construction Aids, Equipments, Tools & Tackles<br />
SECTION-VI (CERTIFICATES AND PAYMENTS)<br />
87.0 Schedule of Rates and Payments<br />
i) Contractor's Remuneration<br />
ii) Schedule of Rates to be inclusive<br />
iii) Schedule of Rates to cover construction<br />
equipment, materials, labour etc.<br />
iv) Schedule of Rates to cover Royalties, Rents<br />
and claims.<br />
46