61 Drawings to be supplied by<br />
the employer<br />
62 Drawings to be supplied by<br />
the contractor:<br />
be valid).<br />
b) Beyond (-) 25% upto & For reduction beyond 25%<br />
inclusive of (-) 50% contractor shall be<br />
compensated by an amount<br />
equivalent to 10% of the<br />
reduction in value of the<br />
contract as awarded. For<br />
example if the actual contract<br />
value is 70% of awarded value<br />
then compensation shall be<br />
10% of (75-70) i.e. 0.5% of<br />
awarded contract value.<br />
II. For Lumpsum Contracts<br />
CONTRACTOR shall, within 7 days of the date of receipt<br />
of order to carry out the WORK, inform the<br />
ENGINEER-IN- CHARGE of the rates which it is his<br />
intention to charge for such class of WORK, supported by<br />
analysis of the rate or rates claimed, and the<br />
ENGINEER-IN-CHARGE shall determine the rate or<br />
rates on the basis of the prevailing market rates, labour<br />
cost at schedule of labour rates plus 10% to cover<br />
contractor's supervision, overheads and profit and pay<br />
the CONTRACTOR accordingly. The opinion of the<br />
ENGINEER- IN-CHARGE as to current market rates of<br />
materials and the quantum of labour involved per unit of<br />
measurement will be final and binding on the<br />
CONTRACTOR.<br />
61.1 The drawings attached with tender are only for the general<br />
guidance to the CONTRACTOR to enable him to visualize the type<br />
of work contemplated and scope of work involved. The<br />
CONTRACTOR will be deemed to have studied the DRAWINGS<br />
and formed an idea about the WORK involved.<br />
61.2 Detailed working drawings on the basis of which actual execution of<br />
the WORK is to proceed, will be furnished from time to time during<br />
the progress of the work. The CONTRACTOR shall be deemed to<br />
have gone through the DRAWINGS supplied to him thoroughly and<br />
carefully and in conjunction with all other connected drawings and<br />
bring to the notice of the ENGINEER-IN-CHARGE discrepancies, if<br />
any, therein before actually carrying out the Work.<br />
61.3 Copies of all detailed working drawings relating to the WORK shall<br />
be kept at the CONTRACTOR's office on the site and shall be made<br />
available to the ENGINEER-IN- CHARGE at any time during the<br />
CONTRACT. The drawings and other documents issued by the<br />
EMPLOYER shall be returned to the EMPLOYER on completion of<br />
the WORK.<br />
62.1 The drawings/date which are to be furnished by the CONTRACTOR<br />
are enumerated in the special conditions of contract, and shall be<br />
furnished within the specified time.<br />
62.2 Where approval/review of drawings before manufacture/<br />
construction/fabrication has been specified, it shall be<br />
CONTRACTOR's responsibility to have these drawings prepared as<br />
per the directions of ENGINEER-IN-CHARGE and got approved<br />
before proceeding with manufacture/construction/fabrication as the<br />
81