61 Drawings to be supplied by<br />

the employer<br />

62 Drawings to be supplied by<br />

the contractor:<br />

be valid).<br />

b) Beyond (-) 25% upto & For reduction beyond 25%<br />

inclusive of (-) 50% contractor shall be<br />

compensated by an amount<br />

equivalent to 10% of the<br />

reduction in value of the<br />

contract as awarded. For<br />

example if the actual contract<br />

value is 70% of awarded value<br />

then compensation shall be<br />

10% of (75-70) i.e. 0.5% of<br />

awarded contract value.<br />

II. For Lumpsum Contracts<br />

CONTRACTOR shall, within 7 days of the date of receipt<br />

of order to carry out the WORK, inform the<br />

ENGINEER-IN- CHARGE of the rates which it is his<br />

intention to charge for such class of WORK, supported by<br />

analysis of the rate or rates claimed, and the<br />

ENGINEER-IN-CHARGE shall determine the rate or<br />

rates on the basis of the prevailing market rates, labour<br />

cost at schedule of labour rates plus 10% to cover<br />

contractor's supervision, overheads and profit and pay<br />

the CONTRACTOR accordingly. The opinion of the<br />

ENGINEER- IN-CHARGE as to current market rates of<br />

materials and the quantum of labour involved per unit of<br />

measurement will be final and binding on the<br />

CONTRACTOR.<br />

61.1 The drawings attached with tender are only for the general<br />

guidance to the CONTRACTOR to enable him to visualize the type<br />

of work contemplated and scope of work involved. The<br />

CONTRACTOR will be deemed to have studied the DRAWINGS<br />

and formed an idea about the WORK involved.<br />

61.2 Detailed working drawings on the basis of which actual execution of<br />

the WORK is to proceed, will be furnished from time to time during<br />

the progress of the work. The CONTRACTOR shall be deemed to<br />

have gone through the DRAWINGS supplied to him thoroughly and<br />

carefully and in conjunction with all other connected drawings and<br />

bring to the notice of the ENGINEER-IN-CHARGE discrepancies, if<br />

any, therein before actually carrying out the Work.<br />

61.3 Copies of all detailed working drawings relating to the WORK shall<br />

be kept at the CONTRACTOR's office on the site and shall be made<br />

available to the ENGINEER-IN- CHARGE at any time during the<br />

CONTRACT. The drawings and other documents issued by the<br />

EMPLOYER shall be returned to the EMPLOYER on completion of<br />

the WORK.<br />

62.1 The drawings/date which are to be furnished by the CONTRACTOR<br />

are enumerated in the special conditions of contract, and shall be<br />

furnished within the specified time.<br />

62.2 Where approval/review of drawings before manufacture/<br />

construction/fabrication has been specified, it shall be<br />

CONTRACTOR's responsibility to have these drawings prepared as<br />

per the directions of ENGINEER-IN-CHARGE and got approved<br />

before proceeding with manufacture/construction/fabrication as the<br />

81