upcoming locations on need basis. In that case, <strong>GAIL</strong> will pay the cost of<br />

the engineer as per the rate quoted by the contractor as per SOR.<br />

(f) The Contractor shall ensure that the team of Resident service engineers<br />

(RSE) should be having Degree (4 years duration)/ Diploma / BCA (three<br />

years duration) in Electronics / Computer Engineering / E&T / IT from<br />

Govt. recognized Institutes & shall have minimum two years in-line job<br />

experience & shall be capable to carry out all the activities of MSS & <strong>FMS</strong><br />

to meet the SLR stipulated in the contract.<br />

(g) All the resident service engineers (RSE) deputed by the contractor for<br />

execution of the contract shall be regular employee of the contractor. The<br />

proof (PF number and copy of the PF card) to this effect should be<br />

produced as and when required by <strong>GAIL</strong>. Sub-contract / franchisee in<br />

terms of manpower deployment will not be acceptable.<br />

(h) The Contractor shall make its deputed personnel’s reporting place at<br />

respective <strong>GAIL</strong> offices. Normally, the comprehensive maintenance & FM<br />

Services will be required during <strong>GAIL</strong>’s working hours from 0915 hours to<br />

1745 hours for six days a week basis. Locations, having more than one<br />

RSE’s, can be asked to come in shift, if so desired by Site EIC.<br />

(i) Contractor shall provide services beyond normal working hours in critical /<br />

emergency situation and during <strong>GAIL</strong> closed / listed holidays, including<br />

Sunday, without any additional cost to <strong>GAIL</strong>, whenever such emergency<br />

services are required, as decided by <strong>GAIL</strong> IT In-charge of respective<br />

location. In case, any critical job has been started during the working<br />

hours, it has to be completed on the same day, even if it continues beyond<br />

the working hours of <strong>GAIL</strong>.<br />

(j) All the Resident Desktop Support Engineers, deployed at various<br />

locations, shall provide <strong>FMS</strong> Support for the installed PCs & Peripherals<br />

devices of that location, irrespective of Systems Warranty Status, without<br />

any cost implication to <strong>GAIL</strong>, till the time of expiry of warranty of those<br />

Systems. However, payment will be made as per SOR, towards <strong>FMS</strong><br />

support for all such PCs (under Warranty) where no Resident Support<br />

engineer has been deployed and <strong>GAIL</strong> requires covering those Systems<br />

under <strong>FMS</strong>.<br />

(k) Resident support engineer deployed at various locations shall also<br />

provide <strong>FMS</strong> support to associated terminals / site offices on requirement<br />

basis. However, in order to meet SLR contractor can depute additional<br />

technical resource from their nearby offices for providing <strong>FMS</strong> support to<br />

associated terminal / site offices of parent site.<br />

(l) All leave and/or absence of the personnel deployed will have to be<br />

planned in advance and proper replacement to be made available. In<br />

order to meet the contingency arising out of sudden and unplanned<br />

absence of key professionals, SUCCESSFUL BIDDER may get the profile of<br />

panel of professionals proposed to be substituted, approved from <strong>GAIL</strong> at<br />

the commencement of the contract and at such intervals as required.<br />

(m) On need basis, RSEs shall be visiting the terminals / sub locations<br />

related and associated to the main location. Accordingly, the conveyances<br />