Contractor shall conduct a detailed verification of the background of all<br />
deployed manpower and depute them for <strong>GAIL</strong> assignment only after<br />
confirming their suitability and certify accordingly before deployment of<br />
manpower. Contractor shall be held responsible in case information<br />
submitted to <strong>GAIL</strong> was found incorrect. Also, this verification & certification<br />
shall be done for all the manpower deployed in substitution / replacement /<br />
temporary time gap arrangement etc.<br />
(g) Any substitution of Resident Service engineers / Data Center engineers /<br />
Operation Manager / Help desk superviser & other Technical & non technical<br />
personnels shall be done with prior intimation to engineer-in-charge of<br />
respective sites. The Contractor shall immediately provide suitable qualified<br />
and experienced replacement to <strong>GAIL</strong> at designated sites and required proof<br />
of employer, PF certificate, qualification and experience shall be submitted<br />
at <strong>GAIL</strong>.<br />
(h) All the critical systems as identified by <strong>GAIL</strong> shall be listed and physically<br />
monitored & checked for upkeeping and availability of the services on<br />
regular basis during the day.<br />
(i) Hardware & software redundancy of the systems shall be tested in<br />
systematic way on quarterly basis in coordination with vendors.<br />
(j) Contractor must ensure proper handover / Takeover of manpower deployed<br />
for <strong>FMS</strong> services in case any engineer resigns / not available for longer<br />
period. The handshaking period shall be there for minimum 15 days without<br />
which the penalty shall be levied as per the formula mentioned in payment<br />
terms.<br />
(i) If any engineer is found to be not having requisite qualification or skill or his<br />
performance or conduct is not found satisfactory, he shall be summarily<br />
removed within 48 hours of being given notice in writing by <strong>GAIL</strong>. The<br />
Contractor shall provide a substitute of the notified personnel within a<br />
period of one week from the time of receipt of notice, failing which the<br />
Contractor shall be liable for non-performance deduction for entire period of<br />
absence.<br />
(j) The Contractor shall at his own cost, arrange for deployment of their RSE’s,<br />
/ DSE’s, Support staff at respective sites and also arrange for necessary<br />
insurance to cover all the risks assumed by the Contractor in respect of its<br />
deputed personnel for the execution of this contract. During the entire<br />
period of the Contract (including extended period), <strong>GAIL</strong> shall have no<br />
liability against any loss / damage / injury etc. to the contractor personnel<br />
or any other concerned regard what-so-ever.<br />
(n) The Contractor shall make his own arrangement for transportation of the<br />
deployed service engineer / Support staff to perform the maintenance<br />
related activities at all sites and inside plant area. For bigger plant location,<br />
such as Pata & Vijaipur, contractor must arrange & provide suitable two<br />
wheeler conveyance facility to their RSE’s along with valid documents and<br />
driving license etc. for their easy accessability inside the plant areas.<br />