Contractor shall conduct a detailed verification of the background of all<br />

deployed manpower and depute them for <strong>GAIL</strong> assignment only after<br />

confirming their suitability and certify accordingly before deployment of<br />

manpower. Contractor shall be held responsible in case information<br />

submitted to <strong>GAIL</strong> was found incorrect. Also, this verification & certification<br />

shall be done for all the manpower deployed in substitution / replacement /<br />

temporary time gap arrangement etc.<br />

(g) Any substitution of Resident Service engineers / Data Center engineers /<br />

Operation Manager / Help desk superviser & other Technical & non technical<br />

personnels shall be done with prior intimation to engineer-in-charge of<br />

respective sites. The Contractor shall immediately provide suitable qualified<br />

and experienced replacement to <strong>GAIL</strong> at designated sites and required proof<br />

of employer, PF certificate, qualification and experience shall be submitted<br />

at <strong>GAIL</strong>.<br />

(h) All the critical systems as identified by <strong>GAIL</strong> shall be listed and physically<br />

monitored & checked for upkeeping and availability of the services on<br />

regular basis during the day.<br />

(i) Hardware & software redundancy of the systems shall be tested in<br />

systematic way on quarterly basis in coordination with vendors.<br />

(j) Contractor must ensure proper handover / Takeover of manpower deployed<br />

for <strong>FMS</strong> services in case any engineer resigns / not available for longer<br />

period. The handshaking period shall be there for minimum 15 days without<br />

which the penalty shall be levied as per the formula mentioned in payment<br />

terms.<br />

(i) If any engineer is found to be not having requisite qualification or skill or his<br />

performance or conduct is not found satisfactory, he shall be summarily<br />

removed within 48 hours of being given notice in writing by <strong>GAIL</strong>. The<br />

Contractor shall provide a substitute of the notified personnel within a<br />

period of one week from the time of receipt of notice, failing which the<br />

Contractor shall be liable for non-performance deduction for entire period of<br />

absence.<br />

(j) The Contractor shall at his own cost, arrange for deployment of their RSE’s,<br />

/ DSE’s, Support staff at respective sites and also arrange for necessary<br />

insurance to cover all the risks assumed by the Contractor in respect of its<br />

deputed personnel for the execution of this contract. During the entire<br />

period of the Contract (including extended period), <strong>GAIL</strong> shall have no<br />

liability against any loss / damage / injury etc. to the contractor personnel<br />

or any other concerned regard what-so-ever.<br />

(n) The Contractor shall make his own arrangement for transportation of the<br />

deployed service engineer / Support staff to perform the maintenance<br />

related activities at all sites and inside plant area. For bigger plant location,<br />

such as Pata & Vijaipur, contractor must arrange & provide suitable two<br />

wheeler conveyance facility to their RSE’s along with valid documents and<br />

driving license etc. for their easy accessability inside the plant areas.<br />