FMS - GAIL
FMS - GAIL
FMS - GAIL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
(l) Other <strong>GAIL</strong> sites where dedicated resident engineer is not available, the<br />
Contractor shall either immediately provide telephonic support or depute his<br />
Engineer from contractor nearest support center for reaching the site at the<br />
earliest possible time & maintain the System availability / uptime as per SLR<br />
at those locations. The Contractor shall devise and maintain unfailing<br />
method of recording all the relevant details of such calls at <strong>GAIL</strong> for the<br />
ease of calculation of down time and other MIS reports as per the provision<br />
of contract.<br />
(m) Contractor shall provide mobile phones at his own cost, to all the deputed<br />
technical resources at all sites so that they could be contacted by <strong>GAIL</strong> at<br />
any time.<br />
(n) The Contractor shall ensure that all its personnel deputed for required<br />
services during the tenure of the Contract and any time thereafter maintain<br />
in the strictest confidence all information relating to the work and shall not,<br />
unless so authorized in writing by GAIIL, divulge or grant access to any<br />
information about the work or its results. The Contractor and / or his<br />
deputed persons shall not destroy / alter any report, note and technical<br />
data relating to the operation / work and not required by <strong>GAIL</strong>. The<br />
obligation is continuing one and shall survive after the completion /<br />
termination of this agreement. Any violation in this regard may lead to the<br />
termination of the contract by <strong>GAIL</strong>.<br />
(o) The Contractor and / or his deputed personnel shall not carry any written<br />
material, layout, diagrams, Floppy Diskettes, Hard Disk, CD, Storage Tapes,<br />
LTO, Pen drive or any other media with S/w, programs and data etc.<br />
belonging to <strong>GAIL</strong> out of any of <strong>GAIL</strong> sites without the prior written<br />
permission from <strong>GAIL</strong>. Any violation in this regard by the Contractor or by<br />
his deputed personnel’s, <strong>GAIL</strong> shall be free to take necessary action as<br />
deemed fit on a case to case basis against the Contractor or his involved<br />
personnel apart from termination of the Contract.<br />
(p) Bachelor / Family accommodation & office transport (to & fro from township)<br />
can be considered by <strong>GAIL</strong> for the contractor deputed personals at<br />
respective plant sites where <strong>GAIL</strong> colony is available. Such a facility can be<br />
provided on chargeable basis as per the prevailing rates fixed by <strong>GAIL</strong> from<br />
time to time. Provision of such a facility shall not be binding on <strong>GAIL</strong> and<br />
shall be subject to its availability & approval by competent authority of <strong>GAIL</strong><br />
at the site. Payment towards the provision of such facilities shall be as per<br />
<strong>GAIL</strong> norms, shall be made directly by Contractor at respective sites. In<br />
case the Contractor fails to settle such accounts, <strong>GAIL</strong> reserves the right to<br />
get the accommodation vacated from the resident support staffs.<br />
(q) The Contractor and his deputed personnel’s shall maintain strict discipline<br />
and good contact among its employees and shall abide by and conform to<br />
all the rules and regulations promulgated by the <strong>GAIL</strong>. In case if any<br />
unacceptable incident makes <strong>GAIL</strong> feel that the conduct of any of the<br />
Contractor personnel is detrimental to <strong>GAIL</strong> interest, <strong>GAIL</strong> shall have the<br />
unqualified right to request the Contractor for the removal of such a person<br />
either for incompetence, unreliability, misbehavior, security reasons etc.<br />
while on or off the job. The Contractor shall comply with any such request<br />
of <strong>GAIL</strong> to remove such personnel at the Contractor’s expense<br />
unconditionally. The Contractor will be allowed a period of maximum of<br />
168