04.08.2013 Views

FMS - GAIL

FMS - GAIL

FMS - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(l) Other <strong>GAIL</strong> sites where dedicated resident engineer is not available, the<br />

Contractor shall either immediately provide telephonic support or depute his<br />

Engineer from contractor nearest support center for reaching the site at the<br />

earliest possible time & maintain the System availability / uptime as per SLR<br />

at those locations. The Contractor shall devise and maintain unfailing<br />

method of recording all the relevant details of such calls at <strong>GAIL</strong> for the<br />

ease of calculation of down time and other MIS reports as per the provision<br />

of contract.<br />

(m) Contractor shall provide mobile phones at his own cost, to all the deputed<br />

technical resources at all sites so that they could be contacted by <strong>GAIL</strong> at<br />

any time.<br />

(n) The Contractor shall ensure that all its personnel deputed for required<br />

services during the tenure of the Contract and any time thereafter maintain<br />

in the strictest confidence all information relating to the work and shall not,<br />

unless so authorized in writing by GAIIL, divulge or grant access to any<br />

information about the work or its results. The Contractor and / or his<br />

deputed persons shall not destroy / alter any report, note and technical<br />

data relating to the operation / work and not required by <strong>GAIL</strong>. The<br />

obligation is continuing one and shall survive after the completion /<br />

termination of this agreement. Any violation in this regard may lead to the<br />

termination of the contract by <strong>GAIL</strong>.<br />

(o) The Contractor and / or his deputed personnel shall not carry any written<br />

material, layout, diagrams, Floppy Diskettes, Hard Disk, CD, Storage Tapes,<br />

LTO, Pen drive or any other media with S/w, programs and data etc.<br />

belonging to <strong>GAIL</strong> out of any of <strong>GAIL</strong> sites without the prior written<br />

permission from <strong>GAIL</strong>. Any violation in this regard by the Contractor or by<br />

his deputed personnel’s, <strong>GAIL</strong> shall be free to take necessary action as<br />

deemed fit on a case to case basis against the Contractor or his involved<br />

personnel apart from termination of the Contract.<br />

(p) Bachelor / Family accommodation & office transport (to & fro from township)<br />

can be considered by <strong>GAIL</strong> for the contractor deputed personals at<br />

respective plant sites where <strong>GAIL</strong> colony is available. Such a facility can be<br />

provided on chargeable basis as per the prevailing rates fixed by <strong>GAIL</strong> from<br />

time to time. Provision of such a facility shall not be binding on <strong>GAIL</strong> and<br />

shall be subject to its availability & approval by competent authority of <strong>GAIL</strong><br />

at the site. Payment towards the provision of such facilities shall be as per<br />

<strong>GAIL</strong> norms, shall be made directly by Contractor at respective sites. In<br />

case the Contractor fails to settle such accounts, <strong>GAIL</strong> reserves the right to<br />

get the accommodation vacated from the resident support staffs.<br />

(q) The Contractor and his deputed personnel’s shall maintain strict discipline<br />

and good contact among its employees and shall abide by and conform to<br />

all the rules and regulations promulgated by the <strong>GAIL</strong>. In case if any<br />

unacceptable incident makes <strong>GAIL</strong> feel that the conduct of any of the<br />

Contractor personnel is detrimental to <strong>GAIL</strong> interest, <strong>GAIL</strong> shall have the<br />

unqualified right to request the Contractor for the removal of such a person<br />

either for incompetence, unreliability, misbehavior, security reasons etc.<br />

while on or off the job. The Contractor shall comply with any such request<br />

of <strong>GAIL</strong> to remove such personnel at the Contractor’s expense<br />

unconditionally. The Contractor will be allowed a period of maximum of<br />

168

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!