Suspension of works:<br />
Employer may do part of<br />
work:<br />
79 Possession prior to<br />
completion:<br />
WORK are unsound, or of a quality inferior to that contracted for, or<br />
otherwise not in accordance with the CONTRACT, the<br />
CONTRACTOR shall on demand in writing from the<br />
ENGINEER-IN-CHARGE or his authorised representative<br />
specifying the WORK, materials or articles complained of<br />
notwithstanding that the same may have been inadvertently<br />
passed, certified and paid for, forthwith rectify or remove and<br />
reconstruct the WORK so specified and provide other proper and<br />
suitable materials or articles at his own cost and in the event of<br />
failure to do so within the period specified by the<br />
ENGINEER-IN-CHARGE in his demand aforesaid, the<br />
CONTRACTOR shall be liable to pay compensation at the rate of 1<br />
% (One percent) of the estimated cost of the whole WORK, for<br />
every week limited to a maximum of 10% (ten percent) of the value<br />
of the whole WORK, while his failure to do so shall continue and in<br />
the case of any such failure the ENGINEER-IN-CHARGE may on<br />
expiry of notice period rectify or remove and re-execute the WORK<br />
or remove and replaced with others, the materials or articles<br />
complained of to as the case may be at the risk and expense in all<br />
respects of the CONTRACTOR. The decision of the<br />
Engineering-in-charge as to any question arising under this clause<br />
shall be final and conclusive.<br />
77.1 i) Subject to the provisions of sub-para (ii) of this clause, the<br />
CONTRACTOR shall, if ordered in writing by the<br />
ENGINEER-IN-CHARGE, or his representative, temporarily<br />
suspend the WORKS or any part thereof for such written<br />
order, proceed with the WORK therein ordered to be<br />
suspended until, he shall have received a written order to<br />
proceed therewith. The CONTRACTOR shall not be<br />
entitled to claim compensation for any loss or damage<br />
sustained by him by reason of temporary suspension of the<br />
WORKS aforesaid. An extension of time for completion,<br />
corresponding with the delay caused by any such<br />
suspension of the WORKS as aforesaid will be granted to<br />
the CONTRACTOR should he apply for the same provided<br />
that the suspension was not consequent to any default or<br />
failure on the part of the CONTRACTOR.<br />
ii) In case of suspensions of entire WORK, ordered in writing<br />
by ENGINEER-IN-CHARGE, for a period of more than<br />
two months, the CONTRACTOR shall have the option to<br />
terminate the CONTRACT.<br />
78.1 Upon failure of the CONTRACTOR to comply with any instructions<br />
given in accordance with the provisions of this CONTRACT the<br />
EMPLOYER has the alternative right, instead of assuming charge<br />
of entire WORK, to place additional labour force, tools, equipments<br />
and materials on such parts of the WORK, as the EMPLOYER may<br />
designate or also engage another CONTRACTOR to carry out the<br />
WORK. In such cases, the EMPLOYER shall deduct from the<br />
amount which otherwise might become due to the CONTRACTOR,<br />
the cost of such work and material with ten percent (10%) added to<br />
cover all departmental charges and should the total amount thereof<br />
exceed the amount due to the CONTRACTOR, the CONTRACTOR<br />
shall pay the difference to the EMPLOYER.<br />
79.1 The ENGINEER-IN-CHARGE shall have the right to take<br />
possession of or use any completed or partially completed WORK<br />
or part of the WORK. Such possession or use shall not be deemed<br />
to be an acceptance of any work completed in accordance with the<br />
CONTRACT agreement. If such prior possession or use by<br />