written, typed or printed characters sent (unless delivered personally or<br />

otherwise proved to have been received by the addressee) by<br />

registered post to the latest known private or business address or<br />

registered office of the addressee and shall be deemed to have been<br />

received in the ordinary course of post it would have been delivered.<br />

1.1.23 "APPROVED" shall mean approved in writing including subsequent<br />

written confirmation of previous verbal approval and "APPROVAL"<br />

means approval in writing including as aforesaid.<br />

1.1.24 "LETTER OF INTENT/FAX OF INTENT” shall mean intimation by a<br />

Fax/Letter to Tenderer(s) that the tender has been accepted in<br />

accordance with the provisions contained in the letter.<br />

1.1.25 "DAY" means a day of 24 hours from midnight to midnight irrespective<br />

of the number of hours worked in that day.<br />

1.1.26 "WORKING DAY" means any day which is not declared to be holiday<br />

or rest day by the EMPLOYER.<br />

1.1.27 "WEEK" means a period of any consecutive seven days.<br />

1.1.28 "METRIC SYSTEM" - All technical documents regarding the<br />

construction of works are given in the metric system and all work in the<br />

project should be carried out according to the metric system. All<br />

documents concerning the work shall also be maintained in the metric<br />

system.<br />

1.1.29 "VALUE OF CONTRACT” or “TOTAL CONTRACT PRICE” shall mean<br />

the sum accepted or the sum calculated in accordance with the prices<br />

accepted in tender and/or the CONTRACT rates as payable to the<br />

CONTRACTOR for the entire execution and full completion of the<br />

work, including change order.<br />

1.1.30 "LANGUAGE FOR DRAWINGS AND INSTRUCTION" All the<br />

drawings, titles, notes, instruction, dimensions, etc. shall be in English<br />

Language.<br />

1.1.31 "MOBILIZATION" shall mean establishment of sufficiently adequate<br />

infrastructure by the CONTRACTOR at "SITE" comprising of<br />

construction equipments, aids, tools tackles including setting of site<br />

offices with facilities such as power, water, communication etc.<br />

establishing manpower organisation comprising of Resident<br />

Engineers, Supervising personnel and an adequate strength of skilled,<br />

semi-skilled and un-skilled workers, who with the so established<br />

infrastructure shall be in a position to commence execution of work at<br />

site(s), in accordance with the agreed Time Schedule of Completion of<br />

Work. "MOBILISATION" shall be considered to have been achieved, if<br />

the CONTRACTOR is able to establish infrastructure as per Time<br />

Schedule, where so warranted in accordance with agreed schedule of<br />

work implementation to the satisfaction of ENGINEER-IN-CHARGE/<br />

EMPLOYER.<br />

1.1.32 "COMMISSIONING" shall mean pressing into service of the system<br />

including the plant(s), equipment(s), vessel(s), pipeline,<br />

machinery(ies), or any other section or sub-section of installation(s)<br />

pertaining to the work of the CONTRACTOR after successful testing<br />

and trial runs of the same.<br />

• "COMMISSIONING" can be either for a completed system or a part<br />

of system of a combination of systems or sub-systems and can be<br />

performed in any sequence as desired by EMPLOYER and in a<br />