FMS - GAIL
FMS - GAIL
FMS - GAIL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
The contractor shall provide ink cartridges / ribbons / toner cartridges for<br />
the substitute / standby printers in case the models supplied are other than<br />
those available at the affected location, till original <strong>GAIL</strong>’s printers are<br />
repaired / restored after satisfactory repairs.<br />
2.4 ESSENTIAL STOCK TO BE KEPT AT SITE<br />
(a) The Contractor is advised to maintain a stock of complete units to be<br />
used as substitutes and requisite critical units, spares, components, device<br />
drivers, other utility software, cables, connectors at all sites to fulfill the SLR.<br />
No Form-31 will be provided by <strong>GAIL</strong> for storing the spares stock at sites.<br />
(b) Stock of Spares: At all the sites where RSEs have been deployed, the<br />
contractor shall maintain stock of spares at any point of time (on-site) to the<br />
tune of minimum 5% of the annual MSS/<strong>FMS</strong> value for the respective site<br />
which will include motherboards, CPU, RAM, CD-Drive, CD-writer, HDD,<br />
SMPS, Graphic cards, 10/100 autosensing NICs, 15’” color monitors,<br />
keyboards, mouse, fuser assembly, component level spares of networking<br />
equipments like modules,memory chips and power supply units etc.<br />
© The spare inventory should be OEM Make / OEM certified. In case of non<br />
availability of any OEM make spares, vendor shall ensure the availability of<br />
new and genuine parts which must be approved by the respective site EIC.<br />
(d) Contractor shall submit a status report on monthly basis to IT incharges<br />
of respective sites, confirming that required number of Spare parts is<br />
available at sites.<br />
(e) The <strong>GAIL</strong> site EIC will ensure that the contractor is provided with<br />
adequate secure storage space under lock & key. EIC of respective sites shall<br />
inspect the stock before the commencement of the contract and may carry<br />
out the inspection from time-to-time so as to ensure that proper stock levels<br />
are being maintained / replenished by the Contractor. The standby stockes<br />
shall be returned to the vendor at the end of the contract. Hence, all the<br />
records shall be kept by the Vendor so that the spares/standby can be<br />
returned back accordingly to the Vendor at the end of the contract.<br />
(f) The Contractor shall create maintenance facilities at respective sites<br />
where RSE has been deputed and arrange for all the requisite tools for<br />
hardware and software, test equipment and any other aid or help to their<br />
service engineers for effectively and efficiently taking up maintenance of the<br />
machines at various locations, at no extra cost to <strong>GAIL</strong>. The <strong>GAIL</strong>’s site EIC<br />
can inspect the facilities time-to-time.<br />
(g) The Contractor shall ensure availability of tool kits, portable Vacuum<br />
cleaner/blower, cleaning agent, and duster, crimping tool etc. at all the<br />
resident engineer’s deputed sites.<br />
163