The contractor shall provide ink cartridges / ribbons / toner cartridges for<br />

the substitute / standby printers in case the models supplied are other than<br />

those available at the affected location, till original <strong>GAIL</strong>’s printers are<br />

repaired / restored after satisfactory repairs.<br />

2.4 ESSENTIAL STOCK TO BE KEPT AT SITE<br />

(a) The Contractor is advised to maintain a stock of complete units to be<br />

used as substitutes and requisite critical units, spares, components, device<br />

drivers, other utility software, cables, connectors at all sites to fulfill the SLR.<br />

No Form-31 will be provided by <strong>GAIL</strong> for storing the spares stock at sites.<br />

(b) Stock of Spares: At all the sites where RSEs have been deployed, the<br />

contractor shall maintain stock of spares at any point of time (on-site) to the<br />

tune of minimum 5% of the annual MSS/<strong>FMS</strong> value for the respective site<br />

which will include motherboards, CPU, RAM, CD-Drive, CD-writer, HDD,<br />

SMPS, Graphic cards, 10/100 autosensing NICs, 15’” color monitors,<br />

keyboards, mouse, fuser assembly, component level spares of networking<br />

equipments like modules,memory chips and power supply units etc.<br />

© The spare inventory should be OEM Make / OEM certified. In case of non<br />

availability of any OEM make spares, vendor shall ensure the availability of<br />

new and genuine parts which must be approved by the respective site EIC.<br />

(d) Contractor shall submit a status report on monthly basis to IT incharges<br />

of respective sites, confirming that required number of Spare parts is<br />

available at sites.<br />

(e) The <strong>GAIL</strong> site EIC will ensure that the contractor is provided with<br />

adequate secure storage space under lock & key. EIC of respective sites shall<br />

inspect the stock before the commencement of the contract and may carry<br />

out the inspection from time-to-time so as to ensure that proper stock levels<br />

are being maintained / replenished by the Contractor. The standby stockes<br />

shall be returned to the vendor at the end of the contract. Hence, all the<br />

records shall be kept by the Vendor so that the spares/standby can be<br />

returned back accordingly to the Vendor at the end of the contract.<br />

(f) The Contractor shall create maintenance facilities at respective sites<br />

where RSE has been deputed and arrange for all the requisite tools for<br />

hardware and software, test equipment and any other aid or help to their<br />

service engineers for effectively and efficiently taking up maintenance of the<br />

machines at various locations, at no extra cost to <strong>GAIL</strong>. The <strong>GAIL</strong>’s site EIC<br />

can inspect the facilities time-to-time.<br />

(g) The Contractor shall ensure availability of tool kits, portable Vacuum<br />

cleaner/blower, cleaning agent, and duster, crimping tool etc. at all the<br />

resident engineer’s deputed sites.<br />