- Page 1 and 2: GAIL (India) Limited 16, Bhikaji Ca
- Page 3: :2: Pre-bid meeting will be held on
- Page 7 and 8: CUT-OUT SLIP DO NOT OPEN-THIS IS A
- Page 9 and 10: CUT-OUT SLIP PART - III (BID SECURI
- Page 11 and 12: Table of Contents A. General 1. Sco
- Page 13 and 14: 4. Bids from Joint Venture / Consor
- Page 15 and 16: idders, at the address, fax numbers
- Page 17 and 18: 13.8 Discount, if any, must be indi
- Page 19 and 20: 19. Zero Deviation 19.1 Bidders to
- Page 21 and 22: 23. Deadline for Submission of Bids
- Page 23 and 24: 31. Conversion to Single Currency f
- Page 25 and 26: c) will declare a firm ineligible a
- Page 27 and 28: To GAIL (India) Limited, 1-1 Bidder
- Page 29 and 30: GAIL (India) Limited, F-3 LIST OF E
- Page 31 and 32: Tender No.: Bidder’s Name: F-3B F
- Page 33 and 34: INSTRUCTIONS FOR FURNISHING BID-GUA
- Page 35 and 36: F-5 LETTER OF AUTHORITY PROFORMA FO
- Page 37 and 38: GAIL India Limited, F-7 CERTIFICATE
- Page 39 and 40: Full Postal Address and phone nos o
- Page 41 and 42: 7. We have power to issue this guar
- Page 43 and 44: SECTION III. GENERAL CONDITIONS OF
- Page 45 and 46: 21.1 Priority of Contract Documents
- Page 47 and 48: v) Schedule of Rates to cover taxes
- Page 49 and 50: General Conditions of Contract Sect
- Page 51 and 52: written, typed or printed character
- Page 53 and 54: the applicable regulations and pass
- Page 55 and 56:
Section-III. General Instructions t
- Page 57 and 58:
5. Transfer of Tender Documents: th
- Page 59 and 60:
10.3 Monthly/Weekly construction pr
- Page 61 and 62:
investigated and considered while s
- Page 63 and 64:
24 Contract Performance Security: A
- Page 65 and 66:
27 Price reduction schedule: the CO
- Page 67 and 68:
30 Contractor remains liable to pay
- Page 69 and 70:
33 Members of the employer not indi
- Page 71 and 72:
Sub- contract is submitted to the E
- Page 73 and 74:
esponsibility with the mechanical,
- Page 75 and 76:
protection that CONTRACTOR is requi
- Page 77 and 78:
Schedules, Notices, Correspondence,
- Page 79 and 80:
60 Alterations in specifications, d
- Page 81 and 82:
61 Drawings to be supplied by the e
- Page 83 and 84:
64 Responsibility for level and ali
- Page 85 and 86:
68 Material procured with assistanc
- Page 87 and 88:
esponsible agent duly accredited in
- Page 89 and 90:
80 (Defects liability period) twelv
- Page 91 and 92:
82 Guarantee/transfer of guarantee:
- Page 93 and 94:
may not fully and precisely furnish
- Page 95 and 96:
SPECIFICATIONS / CONTRACT DOCUMENT.
- Page 97 and 98:
evenue stamp payment shall be made
- Page 99 and 100:
taxes for unemployment compensation
- Page 101 and 102:
agreement of the SUB- CONTRACTOR to
- Page 103 and 104:
102 Damage to Property or to any Pe
- Page 105 and 106:
apprentices act, 1961: Apprentices
- Page 107 and 108:
108 Jurisdiction: "In the event of
- Page 109 and 110:
above. iv) Every opening in the flo
- Page 111 and 112:
treatment of all injuries likely to
- Page 113 and 114:
arrangements and provides necessary
- Page 115 and 116:
Place: Dated: i) This Indemnity/Und
- Page 117 and 118:
2. In consideration of the due prov
- Page 119 and 120:
SECTION IV. SPECIAL CONDITIONS OF C
- Page 121 and 122:
SECTION IV SPECIAL CONDITIONS OF CO
- Page 123 and 124:
1.2 DURATION OF CONTRACT The FMS /
- Page 125 and 126:
1.5 BIDDER’s RESPONSIBILITIES 1.5
- Page 127 and 128:
other party, whether written or ora
- Page 129 and 130:
1.7 SERVICE LEVEL REQUIREMENTS (SLR
- Page 131 and 132:
Less Critical Devices at offices lo
- Page 133 and 134:
(a) For Delhi Corporate Office, Noi
- Page 135 and 136:
(c) Rest of other sites offices of
- Page 137 and 138:
(b) For Rest of other GAIL location
- Page 139 and 140:
1.12 OPERATION OF THE CONTRACT The
- Page 141 and 142:
SECTION V. TECHNICAL SPECIFICATIONS
- Page 143 and 144:
Annexure-AB : Details of remote loc
- Page 145 and 146:
GAIL mail messaging system comprise
- Page 147 and 148:
Supply, Installation & lying of UTP
- Page 149 and 150:
(j) Few Systems / Peripherals, cove
- Page 151 and 152:
to Riots, Earthquake, Fire, Flood,
- Page 153 and 154:
2.2.2. NETWORK & COMMUNICATION LINK
- Page 155 and 156:
c) Separate password list for all s
- Page 157 and 158:
2.2.4 DATA BACKUP AND RESTORE MANAG
- Page 159 and 160:
(a) Configuration / Re-configuratio
- Page 161 and 162:
can also use different mechanism fo
- Page 163 and 164:
The contractor shall provide ink ca
- Page 165 and 166:
upcoming locations on need basis. I
- Page 167 and 168:
Contractor shall conduct a detailed
- Page 169 and 170:
seven calendar days to replace the
- Page 171 and 172:
2.9 ASSISTANCE FOR SYSTEMS UPGRADAT
- Page 173 and 174:
LOCATION WISE DETAILS OF PC's AND P
- Page 175 and 176:
LOCATION WISE DETAILS OF PC's AND P
- Page 177 and 178:
LOCATION WISE DETAILS OF PC's AND P
- Page 179 and 180:
S No. 1 2 NAME & BRIEF DESCRIPTION
- Page 181 and 182:
S No. 1 2 NAME & BRIEF DESCRIPTION
- Page 183 and 184:
S No. 1 2 3 4 5 6 7 8 9 10 11 12 13
- Page 185 and 186:
LIST OF NOIDA DATACENTER SERVERS FO
- Page 187 and 188:
LIST OF NOIDA DATACENTER SERVERS FO
- Page 189 and 190:
ANNEXURE - E LIST OF LOCATIONS, NAM
- Page 191 and 192:
ANNEXURE - E LIST OF LOCATIONS, NAM
- Page 193 and 194:
DETAILS OF OFC SEGMENTS OF PATA PLA
- Page 195 and 196:
S.No. Clause no. of Tender Brief de
- Page 197 and 198:
8 9 10 11 DSE for Network Managemen
- Page 199 and 200:
Sr No GAIL office Location LIST OF
- Page 201:
LIST OF BIDDERS NEAREST ESTABLISHME
- Page 204:
Samakhyali Samakhyali Agra Agra Jam
- Page 208 and 209:
Jaipur NOIDA ISDN BRI: 2B+D - 3 no
- Page 210 and 211:
GAIL Data centre at Noida will have
- Page 212 and 213:
TABLE-A S. No. H/w type / Make H/w
- Page 214 and 215:
18 HP LaserJet (A4 Mono) 2200-2200
- Page 216 and 217:
38 Wipro DMP HQ-2400+ 18 16/02/2007
- Page 218 and 219:
58 Samsung CD-Writer 8X\LG RW-32-40
- Page 220 and 221:
78 HP SCANJET XPA HP SCANJET XPA 1
- Page 222 and 223:
S.No Make Model No. IT Asset Descri
- Page 224 and 225:
18 SUN 19 SUN 20 SUN 21 HP SUN ULTR
- Page 226 and 227:
Sr. No. IT Asset Description Total
- Page 228 and 229:
28 RADWARE SWITCH 6 16/02/2007 12 2
- Page 230 and 231:
56 57 58 59 UPS 2 KVA, APC Battery
- Page 232 and 233:
78 SUN STORAGE 4 16/02/2007 12 79 S
- Page 234 and 235:
9 RSE-GAIL BELAPUR 10 11 12 13 RSE-
- Page 236 and 237:
TABLE-F SOR FOR ATTENDENT AT VARIOU
- Page 238 and 239:
Sr. No. Item Name LOCATION No. of D
- Page 240 and 241:
PRINTER HEAD PRINTER HEAD PRINTER H
- Page 242 and 243:
PATCH CORD 6 MM PATCH CORDS Fibre p
- Page 244:
TABLE NAME SUMMARY & TOTAL OF ALL S