11.07.2015 Views

FYE 14 Budget prelim - City of Norman

FYE 14 Budget prelim - City of Norman

FYE 14 Budget prelim - City of Norman

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CITY OF NORMANGOALS:DIVISION SERVICE EFFORTSAND ACCOMPLISHMENTSWATER RECLAMATION / LABORATORY• Improve ODEQ inspection reviews.• Ensure the validity, reliability, and timeliness <strong>of</strong> the laboratory’s analysis results.OBJECTIVES:• Adhere to the regulations at 40 CFR.• Increase the percentage <strong>of</strong> “acceptable” quality control analysis.PERFORMANCE MEASUREMENTS - RESULTS REPORT:<strong>FYE</strong> 11 <strong>FYE</strong> 12 <strong>FYE</strong> 13 <strong>FYE</strong> <strong>14</strong>ACTUAL ACTUAL PLAN ESTIMATE PROJECTEDPERFORMANCE INDICATORS:Number <strong>of</strong> deficiencies on ODEQ annualinspections0 0 0 0 0Percent compliance with QC standards 95.8% 100% 100% 100% 100%Notes to Results Report:ODEQ – Oklahoma Department <strong>of</strong> Environmental QualityCFR – Code <strong>of</strong> Federal RegulationsQC – Quality ControlANNUAL BUDGET346

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!