11.07.2015 Views

TABLE OF CONTENTS - The Professional Green Building Council

TABLE OF CONTENTS - The Professional Green Building Council

TABLE OF CONTENTS - The Professional Green Building Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>The</strong>me B: Creating a livable, healthy and environmentally viable cities3.3 Importance of construction plan and design stageNo matter what type or scale of the construction, it has its life limit. When its lifecycle proceeds, the construction is in function for a long period of time until itbecomes no more economic value. In the research by R.Ries and A. Mahdavi, itdivides the construction life cycle into three stages: construction, operation anddecommission [5]. It also develops a computer evaluation system to support the lifecycle assessment during the design stage of the construction in order to understand theenvironmental impact caused by construction. In the “Handbook of <strong>Building</strong>Maintenance Management”, it has illustrate the cost and time spend in each stage ofthe construction project: the average construction project requires 3 years for theplanning; 1~2 years for the designing; 4~5 years for the construction depending on thescale of the project and the operating and maintaining lasts 40~50 years which is 9~10times of the time spent for all the other stages [6]. This proves the importance foroperation and maintenance within the construction life cycle. However, all the stagewithin the construction life cycle is closely connected, if the plan and design does notmeet the need for the users, it will cause the problem of reconstruction or other futureoperation and maintenance problems. <strong>The</strong>refore, with good management of thebeginning stage, plan and maintenance, for the construction management; it preventsthe unnecessary cost.4. THE DEFECTS CAUSING THE DIFFICULTY IN THEIMPLEMENTATION <strong>OF</strong> PROPERTY MANAGEMENT4.1 <strong>The</strong> implementation defects during construction plan and design stage<strong>The</strong> study focus on the implementation defects during construction plan and designstage. <strong>The</strong> study draws the conclusion of the following three defects:317

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!