11.07.2015 Views

TABLE OF CONTENTS - The Professional Green Building Council

TABLE OF CONTENTS - The Professional Green Building Council

TABLE OF CONTENTS - The Professional Green Building Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>The</strong>me B: Creating a livable, healthy and environmentally viable citiesresources encourage warrants better studies on refurbishment options (CAR 2003and Balaras 2004).Traditionally, retrofitting of office buildings have been done on ad-hoc basis.Owners, designers and contractors alike were often troubled by the poor buildingdocumentation and lack of reference to successful examples. As a result, designersmay not foresee all of the potential problems while the contractors apply hugemark-up for having to deal with the risks. As these professionals begin to get morevolume of work, the characteristics of these refurbishment projects and strategiesto maximise the opportunities for technological, sustainable and economicsolutions become important issues.Previous research identified the needs for the total consideration of buildingsstructural assessment, modelling of operating and maintenance costs (Reyers 2001),new architectural and engineering designs that maximise the utility of the existingstructure and resulting productivity improvement, project risks and their mitigation(Gray, 1999 and Skorupka 2001), specific construction management proceduresincluding procurement methods, work flow and scheduling and occupational healthand safety (Cox 2004). Recycling potential and conformance to codes may beother major issues (Faniran, 1998 and Nigel et al 2001).This paper introduces examples of Australian research projects which provided amore holistic approach to the decision making of refurbishing office space, usingappropriate building technologies and products, assessment of residual service life,floor space optimisation and project procurement in order to bring aboutsustainable outcomes. <strong>The</strong> paper also discusses the case studies that helped identifyand evaluate critical factors that influence key building components for theseprojects and key issues for integrated decision support when dealing with therefurbishment, and indeed the relifing, of office buildings.449

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!