ITTC – Recommen<strong>de</strong>d<br />

7.5-04<br />

-01-01.1<br />

Procedures and Gui<strong>de</strong>lines Page 4 of 10<br />

Full Scale Measurements<br />

Speed and Power Trials<br />

Preparation and Conduct of<br />

Speed/Power Trials<br />

Effective Date<br />

2005<br />

Revision<br />

03<br />

• The Shipbuil<strong>de</strong>r has, if necessary, to arrange<br />

for divers to inspect the ship’s hull<br />

and propellers.<br />

• The Trial Lea<strong>de</strong>r is the duly authorized<br />

(shipbuil<strong>de</strong>r’s representative) person responsible<br />

for the execution of all phases of<br />

the Speed/Power trials including the pretrial<br />

preparation.<br />

3.2 The Trial Team<br />

The trial team is responsible for correct<br />

measurements and analysis of the measured<br />

data according to the state of the art.<br />

The trial team is responsible for the following:<br />

a. Conduct ship inspection, if possible or<br />

necessary.<br />

b. Provi<strong>de</strong>, install and operate all required<br />

trial instrumentation and temporary cabling.<br />

c. If previously arranged, provi<strong>de</strong> the ship<br />

master and owner’s representative with<br />

a preliminary data package before <strong>de</strong>barking.<br />

The contents of the data package<br />

will be <strong>de</strong>termined in consultation<br />

with the owner’s representative at the<br />

initial pre-trial briefing.<br />

d. Provi<strong>de</strong> a final report after completion<br />

of the trials in accordance with any<br />

agreement between the shipbuil<strong>de</strong>r and<br />

the ship owner.<br />

4. PROCEDURES<br />

4.1 Trial Preparation<br />

4.1.1 Shipbuil<strong>de</strong>r’s Support Requirement:<br />

Prior to the trials the required instrumentation<br />

has to be installed. The assistance of the<br />

ship’s or shipbuil<strong>de</strong>r’s crew will be required<br />

when making electrical connections to the<br />

ship's systems and circuits such as heading,<br />

wind speed, wind direction, and rud<strong>de</strong>r angle<br />

synchronous repeaters. The following support<br />

is requested from the Shipbuil<strong>de</strong>r to properly<br />

prepare for the trials:<br />

a. Provi<strong>de</strong> access to the ship for trial instrumentation.<br />

b. Assistance is required for the following<br />

electrical connections:<br />

• Gyrocompass<br />

• Wind meter<br />

• Rud<strong>de</strong>r angle indicator<br />

• Log Speed<br />

• Propeller Pitch<br />

c. Vary the output level of each of the<br />

above measurement sources to ensure<br />

the proper operation and alignment of<br />

the test instrumentation<br />

4.1.2 Space Requirements<br />

Spaces and an electric supply a<strong>de</strong>quate for<br />

the trial equipment will be required for the trial<br />

instrumentation and computers.