DETAILED USER & TECHNICAL REQUIREMENTS FOR CDPS<br />

AND USE-CASE MODELS<br />

Ref: PHASE V<br />

- When the decision on control of goods which have been declared within the simplified procedure of<br />

local clearance for release of goods for an import regime with economic impact is taken, the notification<br />

of this control shall be electronically sent to the declarant or his representative (to a person who lodge<br />

this declaration). Authentication of this notification of control shall be with the e-signature of customs<br />

administration, according to the Article 109 para. 2 of the <strong>Customs</strong> Law implementing Regulation 2 . This<br />

notification shall be sent at the end of the time limit (timer for automatic release of goods) set up in the<br />

authorisation (in the Authorisation sub-application) to give a time to the customs authorities responsible<br />

for this control to be present at the authorised place, where the goods are available, before the<br />

notification is sent to the declarant or his representative (to a person who lodge the declaration for an<br />

import regime with economic impact). At that time the timer for automatic release of goods shall be<br />

stopped.<br />

- When the timer for automatic release of goods expired <strong>and</strong> no decision on control of goods was taken,<br />

the goods are automatically released for an import regime with economic impact. The decision on release<br />

of goods for an import regime with economic impact shall be electronically sent to the declarant or his<br />

representative at that moment. Authentication of this decision shall be with an e-signature of customs<br />

administration, according to the Article 109 para. 2 of the <strong>Customs</strong> Law implementing Regulation 2 .<br />

- Based on the decision on release of goods for an import regime with economic impact which was<br />

electronically sent to the declarant or his representative by the customs office of import, the declarant<br />

shall send back the electronic confirmation of delivery of this decision. This time shall be registered in<br />

CDPS. The time of delivery of this decision shall be the time of delivery of confirmation.<br />

- The import operation with the release of goods for an import regime with economic impact shall finish<br />

when the an import regime with economic impact is discharged – see part 3.4.5.10 of this document.<br />

- No supplementary declaration for release of goods for an import regime with economic impact shall be<br />

lodged by the declarant at the customs office of import.<br />

3.4.5.4 Use of simplified procedure of incomplete declaration<br />

- According to the Article 167 para. 1 of <strong>Customs</strong> Law Implementing Regulation 2 the simplified procedure<br />

of incomplete import declaration for release of goods for an import regime with economic impact shall<br />

allow the customs authority to accept, only in a duly justified case, an import declaration for release of<br />

goods for an import regime with economic impact which does not contain all the particulars required, or<br />

which is not accompanied by all documents necessary for this import regime.<br />

- The minimum data elements of incomplete import declaration for release of goods for an import regime<br />

with economic impact shall be introduced <strong>and</strong> it shall be in line with the Articles 184 <strong>and</strong> 191 of<br />

<strong>Customs</strong> Law Implementing Regulation 2 .<br />

- The time limit for supplementary lodging of missing data or documents of incomplete import declaration<br />

for release of goods for an import regime with economic impact shall be assigned by the customs office<br />

of import. St<strong>and</strong>ard time shall not be longer that 1 month, according to the Article 172 para. 1 of<br />

<strong>Customs</strong> Law Implementing Regulation 2 . In dully justified cases <strong>and</strong> on the request of declarant the<br />

customs office of export can prolong this time period. That period may not exceed 4 months from the<br />

date of acceptance of the declaration, according to the Article 172 para. 1 (Articles 184 <strong>and</strong> 191) of<br />

<strong>Customs</strong> Law Implementing Regulation 2 .<br />

- The incomplete import declaration for release of goods for an import regime with economic impact can<br />

be lodged in:<br />

o electronic form, or<br />

o paper form of Single Administrative Document (SAD).<br />

- The rules <strong>and</strong> processes described in parts 3.4.5.1 <strong>and</strong> 3.4.5.2 of this document are also used within the<br />

usage of simplified procedure of incomplete import declaration for release of goods for an import regime<br />

with economic impact.<br />