08.11.2014 Views

Download Pdf - Ministry of Education and Sports

Download Pdf - Ministry of Education and Sports

Download Pdf - Ministry of Education and Sports

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

30<br />

rehabilitated <strong>and</strong> h<strong>and</strong>ed over<br />

One (1) Vocational Training Institute<br />

rehabilitated, exp<strong>and</strong>ed <strong>and</strong> reequipped<br />

Two (2) Technical Institutes rehabilitated,<br />

exp<strong>and</strong>ed <strong>and</strong> re­equipped<br />

Forty (40) teachers’ houses completed <strong>and</strong><br />

h<strong>and</strong>ed over<br />

Madera Technical, Runkugiri Technical, Jinja Vocational Inst.<br />

Packada SS, Kidongole SS, Mateete SS, Mbarara SS, Bogezza<br />

SS, Namugongo SS, Kabalega SS, Mpanga SS <strong>and</strong> Lango<br />

College.<br />

Paid final Certificate for the construction <strong>of</strong> 40 teachers’ houses<br />

which are being constructed at the 25 seed secondary school.<br />

(iii) ADB IV support to<br />

USE<br />

5.569 5 new Seed Schools constructed in Kumi in<br />

Tororo.Bududa, Nakaseke Kalisizo Rakai<br />

district10 existing Seed Secondary Schools<br />

exp<strong>and</strong>ed in Bugunzu Seed<br />

School,Buweswa S.S , Ojetanyang S.S<br />

Bukanga S.S (Iganga district), Busaba S.S<br />

(Butaleja district), Kabei S.S<br />

(Bukwo district), Kalomgo S.S (Nakasongola<br />

district), Bulamu<br />

S.S (Mpigi district), Nagulu S.S (Wakiso<br />

district) <strong>and</strong>Koome S.S (Mukono district);<br />

7 New Seed secondary schools progress to<br />

75% level <strong>of</strong>completion;Ogoko S.S, Apoo<br />

S.S, Patongo S.S,Kanara S.S, Bufunjo S.S<br />

<strong>and</strong> Katungulu S.S<br />

5 existing seed secondary schools’ expansion<br />

progresses to 75% level <strong>of</strong> completion new<br />

seed secondary schools (Atutur SS in Kumi<br />

district,<br />

Mella SS in Tororo district, Bumayoka SS in<br />

Bududa district, Wakyato<br />

SS in Nakaseke district <strong>and</strong> Kalisizo SS in<br />

Rakai district)<br />

7 New S.Ss being constructed which include:<br />

Ogoko SeedSchool, Apoo S.S, Patongo S.S,<br />

Kanara S.S,Bufunjo S.S <strong>and</strong> Katungulu S.S<br />

5 Existing S.Ss being exp<strong>and</strong>ed which<br />

include: Ramogi Seed School (Yumbe<br />

district), Ayer S.S (Apac district), Bub<strong>and</strong>i<br />

Seed School (Bundibugyo district), Buhanika<br />

S.S (Hoima district) <strong>and</strong> Kamwenge S.S<br />

5.091 Civil works commenced on 15 sites under phase 1; cluster 1<br />

Schs are:Bumayoka SSS, Wakyato SSS, Kalisizo SSS, Meela<br />

SSS, Aturtur SSS,as new construction sites Bukanga SSS,<br />

Busaba SSS, Kabei SSS, Bugunzu SSS, Buweeswa SSS,<br />

Ojetanyang SSS, Kalongo SSS, Bulamu SSS, Koome SSS <strong>and</strong><br />

Nagulu are for expansion,<br />

SSS Sites are at 35% level <strong>of</strong> completion<br />

ESSAPR FY 2011/12 to inform the 19 th ESSR – OCTOBER 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!