Download Pdf - Ministry of Education and Sports
Download Pdf - Ministry of Education and Sports
Download Pdf - Ministry of Education and Sports
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Secondary Schools <strong>and</strong> expansion <strong>of</strong> facilities in the existing secondary schools during the period<br />
under review.<br />
Under the development <strong>of</strong> secondary education, a number <strong>of</strong> projects were undertaken as follows;<br />
46<br />
Civil works were completed at Paicho Seed S.S in Gulu, Administration blocks were also<br />
completed at Bussi S.S in Wakiso; Nkondo Seed S.S in Kamuli <strong>and</strong> Bukonte Seed S.S in<br />
Namutumba;<br />
Emergency renovations <strong>and</strong> repairs were carried out in Bugobi High School in Namutumba <strong>and</strong><br />
Wakatayi S.S in Luwero after ro<strong>of</strong>s were blown <strong>of</strong>f by the wind;<br />
An underground water tank at Butoloogo Seed S.S in Mubende was repaired, <strong>and</strong> students’<br />
toilets were constructed at; Bulamogi College Gadumire in Kaliro, Kagulwe S.S in Mpigi,<br />
Buhanika Seed S.S in Hoima, Bukanga Seed S.S in Luuka, <strong>and</strong> Kitende S.S in Wakiso;<br />
The sector continued to clear outst<strong>and</strong>ing payments for the construction <strong>of</strong> Seed Secondary<br />
Schools at Kameruka Seed S.S, Budaka; Lagoro Seed S.S in Kitgum; <strong>and</strong>, Rwemikoma in<br />
Kiruhura;<br />
L<strong>and</strong> claimants at Adwari S.S in Lira were compensated <strong>and</strong> civil works for the rehabilitation <strong>of</strong><br />
Sir Samuel Baker School completed;<br />
Construction <strong>of</strong> 40 units <strong>of</strong> teachers’ houses <strong>and</strong> 25 Seed Secondary Schools were completed<br />
with funding from ADB III.<br />
Civil works at 6 traditional schools under ADB III, phase II were completed at Masaba S.S.S,<br />
Kabalega S.S.S, Lango College in Lira, Mpanga S.S in Kabarole, Kigezi College Butobere in<br />
Kabale <strong>and</strong> Kololo S.S in Kampala.<br />
Civil works for the expansion <strong>of</strong> Six (06) Seed Secondary Schools were completed at Bageeza<br />
Seed S.S in Mubende, Namugongo Seed S.S in Kaliro; Pakadha Seed S.S in Zombo; Mbarara S.S<br />
<strong>and</strong> Kidongole S.S in Bukedea.<br />
Under ADB IV civil works are in progress at 15 sites – (5 new Seed Secondary Schools <strong>and</strong> 10<br />
existing Seed Secondary Schools at Atutur S.S in Kumi, Mela S.S in Tororo, Bumayako SSS in<br />
Bududa, Wakyato SSS in Nakaseke <strong>and</strong> Kalisizo Town Council SSS in Rakai a total <strong>of</strong> 10<br />
existing seed secondary schools are being exp<strong>and</strong>ed as follows; Bugunzu SSS in Sironko,<br />
Buweswa SSS in Manafwa, Bukanga SSS in Iganga, Ojetanyang SSS in Soroti, Busaba SSS in<br />
Butaleja, Kabei SSS in Bukwo; Kalongo SSS in Nakasongola, Bulamu SSS in Mpigi, Naggulu SSS<br />
in Wakiso, <strong>and</strong> KKoome SSS in Mukono. The sites above are at 18% level <strong>of</strong> completion.<br />
Under support to USE (IDA) project the following have been done;<br />
Civil works are in progress at 659 Secondary schools that were under phase I <strong>and</strong> II <strong>and</strong> 159<br />
have been completed.<br />
Construction <strong>of</strong> 3314 new classrooms.<br />
Construction <strong>of</strong> 112 new libraries.<br />
Construction <strong>of</strong> 345 2 unit multipurpose science rooms.<br />
Construction <strong>of</strong> 38 new administration blocks.<br />
Construction <strong>of</strong> 65 new teachers’ houses.<br />
Construction <strong>of</strong> 1288 new 5 – stance pit latrines.<br />
Providing water harvesting systems in selected schools.<br />
ESSAPR FY 2011/12 to inform the 19 th ESSR – OCTOBER 2012