Habitat<br />
• SLL PRQ: Comply with an existing Habitat<br />
Conservation Plan or create one if there<br />
is a high likelihood of imperiled species<br />
existing.<br />
• SLL CR: Use native plants for previously<br />
developed sites; or conserve all important<br />
natural habitats (may substitute for water<br />
body conservation). (1 point)<br />
• SLL CR: Restore native habitat in an area<br />
equal to 10% of the development footprint<br />
(may substitute for water body restoration).<br />
(1 point)<br />
• SLL CR: Create a management plan and<br />
funding for habitat sites for 10 years(may<br />
substitute for water body management).<br />
(1 point)<br />
• Protected areas are: positively influenced (1,0);<br />
not affected or protected areas are not existing<br />
(2,0); affected and the protected area’s goals<br />
are not met (3,0); are considerably impaired<br />
(6,0). Weight: 6.0%<br />
• Habitat protection is: positively influenced (1,0);<br />
not affected or habitat is not existing (2,0); only<br />
affected to a small extent (3,0); are greatly<br />
affected (6,0). Weight: 6.0%<br />
• Flora and fauna are: positively influenced (1,0);<br />
not affected (2,0); only affected to a small<br />
extent (3,0); are greatly affected (6,0). Weight:<br />
3.0%<br />
Site Disturbance<br />
• SLL CR: Do not develop on steep slopes<br />
over 15% or limit development to 40-60%<br />
of the site with slopes of 15-40%; no development<br />
of slopes over 40%. (1 point)<br />
• GCT PRQ: Implement an Erosion and Sedimentation<br />
Control Plan for construction<br />
activities.<br />
• GCT CR: Minimize site disturbance by<br />
locating on a previously developed site or<br />
by leaving 10-20% of the site undisturbed.<br />
(1 point)<br />
• GCT CR: Minimize site disturbance during<br />
construction by locating on a previously<br />
developed site; or by limiting disturbance<br />
within 40 feet (12 meters) beyond buildings<br />
and 10-25 feet (3-8 meters) beyond<br />
sidewalks and roads; or by preserving<br />
significant tree species and majority of all<br />
trees. (1 point)<br />
• None<br />
Social Issues<br />